TEXAS · WELLS · CULBERSON COUNTY · TIGER 35 LEASE · API 42-109-32374 · DISTRICT 7B

Tiger 35 #2

Shut in

Culberson County · Ford West (4100) field · Shut In  · Vertical

Tiger 35 #2 (API 42-109-32374) is a well in Culberson County operated by Echo Energy Partners LLC, completed July 2, 2011 and listed as shut in on the RRC schedule, shut in July 1, 2023.

The RRC has issued one drilling permit, issued February 24, 2011, permitted to 4,902 ft.

It was permitted by Finley Resources, Inc. and has since transferred to Echo Energy Partners LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Lamar, Ramsey, Cherry Canyon.

Its lease has reported 195K barrels of oil and 321K mcf of gas since May 2011, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Echo Energy Partners LLC

Permitted by Finley Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Phone
(713) 443-0000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEcho Energy Partners LLC
Production reportsAntelope Energy Partners, LLCthrough Nov 2024
Latest permitFinley Resources, Inc.Feb 24, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,902
total depth, ft
1
permits on file
Feb 24, 2011
last permit issued
Jul 2, 2011
completed
195K
cumulative oil, bbl
321K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 2, 2011
Shut in
Jul 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tiger 35 O-10-41493Ford, West (4100)Echo Energy Partners, LLC4195K321KMay 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 546(-100%)

0200400202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 588(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Finley Resources, Inc.May 2011 → May 2015
  2. 2Ring Energy, Inc.Jun 2015 → Feb 2023
  3. 3Antelope Energy Partners, LLCMar 2023 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
710167-99DrillFinley Resources, Inc.Feb 11, 2011Feb 24, 2011Apr 11, 20115,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 2, 2011Tiger 35 O-10-41493Ford West (4100)Echo Energy Partners LLCShut In · shut in Jul 1, 20234,902

Formation tops

As filed on W-2/G-1. Subsea from 3,038 ft elevation.Download CSV →

FormationMD ftSubsea
LamarLAMAR LIME2,512526
Ramsey2,554484
Cherry CanyonCHERRY CANYON TOP3,436-398

Perforations

Perforated and open-hole intervals.

FromToType
3,7783,812Perforated
3,9113,954Perforated
4,1064,120Perforated
4,2484,319Perforated
4,6644,754Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62539312.25250 S
5.54,9027.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 2012Jul 12, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10932374, documented in the API reference.