WELL · 42-109-33163 · DISTRICT 8

Scott Fee 36 #2H

Y

Culberson County · Ford West (Wolfcamp) field · Producing  · Horizontal

Scott Fee 36 #2H (API 42-109-33163) is a horizontal well in Culberson County operated by Capitan Energy Incorporated, completed October 31, 2017 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 21, 2017, permitted to 12,000 ft.

Completion filings report 9 formation tops, including Delaware, Cherry Canyon, Bone Spring, Wolfcamp.

No lease production has been reported under this well’s leases.

Operator of record

Capitan Energy Incorporated

Carlsbad, NM · P-5 Y, filed Jun 4, 2026 · 230 permits on file · (830) 285-4587

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCapitan Energy Incorporated
Production reportsCapitan Energy, Incorporatedthrough Mar 2026
Latest permitCapitan Energy, IncorporatedAug 21, 2017
12,000
total depth, ft
2
permits on file
Aug 21, 2017
last permit issued
Oct 31, 2017
completed
0
cumulative oil, bbl
3.74M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 31, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.803069, -104.112683

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Culberson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scott Fee 36 G-10-286228Ford, West (Wolfcamp)Capitan Energy, Incorporated103.74MOct 2017 – Jul 2026

Gas, mcf lease total

Last 12 months 502,187 · prior 12 138,245(+263%)

0100K200K300K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Capitan Energy, IncorporatedOct 2017 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
829939-98DrillCapitan Energy, IncorporatedDec 12, 2018Aug 21, 2017Sep 14, 201712,000
829939-99DrillCapitan Energy, IncorporatedAug 16, 2017Aug 21, 2017Sep 14, 201712,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-286228————

Formation tops

As filed on W-2/G-1. Subsea from 3,170 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware2,206964
DelawareFORD-DELAWARE2,262908
Cherry Canyon3,1655
Bone SpringBONE SPRINGS5,815-2,645
Wolfcamp8,767-5,597
Atoka——
Mississippian——
Morrow——
Rustler——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
9,36013,845Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,18512.251,035 S
79,3508.75530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 23, 2019Jan 4, 2019Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Scott Fee 3642-109-34189

0.0 KM · Capitan Energy, Incorporated · Section with this well →

Bell Canyon2,206975
Cherry Canyon3,13348
Brushy Canyon4,300-1,119
Bone Spring5,811-2,630
Wolfcamp8,922-5,741
Delaware—
Strawn—
Rustler—

10 TOPS · FIRST 8

Scott Fee 3642-109-34188

0.0 KM · Capitan Energy, Incorporated · Section with this well →

Bell Canyon2,200981
Cherry Canyon3,13744
Brushy Canyon4,287-1,106
Bone Spring5,798-2,617
Wolfcamp8,878-5,697
Rustler—
Strawn—
Delaware—

10 TOPS · FIRST 8

Cavalcade 25 Unit42-109-33164

0.4 KM · Cimarex Energy Co. · Section with this well →

Delaware2,1671,024
Cherry Canyon3,218-27
Bone Spring5,765-2,574
Wolfcamp8,750-5,559
Mississippian—
Delaware—
Atoka—
Morrow—

10 TOPS · FIRST 8

Scott Fee 3642-109-33533

0.6 KM · Capitan Energy, Incorporated · Section with this well →

Cherry Canyon3,13957
Bone Spring5,802-2,606
Wolfcamp8,756-5,560
Strawn—
Delaware—
Rustler—
Delaware—
Morrow—

10 TOPS · FIRST 8

Lauren State 3042-109-32691

1.0 KM · Capitan Energy, Incorporated · Section with this well →

Cherry Canyon3,164-11
Bone Spring5,865-2,712
Wolfcamp8,881-5,728
Atoka—
Delaware—
Delaware—
Mississippian—
Morrow—

10 TOPS · FIRST 8

Scott Fee 3642-109-33516

1.0 KM · Capitan Energy, Incorporated · Section with this well →

Cherry Canyon3,11799
Bone Spring5,778-2,562
Wolfcamp8,728-5,512
Silurian (undifferentiated)—
Atoka—
Morrow—
Strawn—
Rustler—

10 TOPS · FIRST 8

Scott Fee 3642-109-33508

1.0 KM · Capitan Energy, Incorporated · Section with this well →

Cherry Canyon3,106110
Bone Spring5,746-2,530
Wolfcamp8,700-5,484
Atoka—
Strawn—
Rustler—
Morrow—
Mississippian—

10 TOPS · FIRST 8

Hay Maya42-109-33971

1.2 KM · Chevron U. S. A. Inc. · Section with this well →

Delaware2,257896
Cherry Canyon3,11538
Bone Spring5,840-2,687
Bone Spring7,432-4,279
Bone Spring8,486-5,333
Wolfcamp8,805-5,652
Strawn—
Capitan—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10933163, documented in the API reference.