WELL · 42-109-33606 · DISTRICT 8

Hay Denise State 08/05 #0023TB

Y

Culberson County · Sandbar (Bone Spring) field · Producing  · Horizontal

Hay Denise State 08/05 #0023TB (API 42-109-33606) is a horizontal well in Culberson County operated by Chevron U. S. A. Inc., completed February 17, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 31, 2019, permitted to 12,000 ft.

Completion filings report 11 formation tops, including Cherry Canyon, Brushy Canyon, Bone Spring, Atoka.

No lease production has been reported under this well’s leases.

Operator of record

Chevron U. S. A. Inc.

Midland, TX · P-5 Y, filed Nov 4, 2025 · 9,291 permits on file · (800) 231-0623

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChevron U. S. A. Inc.
Production reportsChevron U. S. A. Inc.through Jan 2025
Latest permitChevron U. S. A. Inc.Dec 31, 2019
12,000
total depth, ft
1
permits on file
Dec 31, 2019
last permit issued
Feb 17, 2022
completed
0
cumulative oil, bbl
770K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2020 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 17, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.852657, -104.082792

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Culberson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hay Denise State 08/05 G-10-292878Sandbar (Bone Spring)Chevron U. S. A. Inc.10770KJul 2020 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 18,677(-100%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Feb 2022 → Jan 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
860292-99DrillChevron U. S. A. Inc.Dec 19, 2019Dec 31, 2019Feb 1, 202012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-292878————

Formation tops

As filed on W-2/G-1. Subsea from 3,235 ft elevation.Download CSV →

FormationMD ftSubsea
Cherry Canyon3,412-177
Brushy Canyon4,590-1,355
Bone Spring6,089-2,854
Bone SpringBONE SPRINGS6,089-2,854
Atoka——
Bone SpringBONE SPRINGS——
CapitanCAPITAN REEF——
Cherry Canyon——
Delaware——
DelawareFORD / DELAWARE——
DelawareFORD-DELAWARE——
Mississippian——
Morrow——
Rustler——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
9,63119,934Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,49912.251,066 S
78,4608.75751 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 2023Feb 28, 2023—
00Nov 9, 2022Aug 2, 2022—
00Aug 11, 2022May 13, 2022—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Hay Denise State 08/0542-109-33608

0.0 KM · Chevron U. S. A. Inc. · Section with this well →

Cherry Canyon3,406-170
Bone Spring6,092-2,856
Wolfcamp9,098-5,862
Morrow—
Mississippian—
Delaware—
Delaware—
Atoka—

10 TOPS · FIRST 8

Hay Denise State 08/0542-109-33607

0.0 KM · Chevron U. S. A. Inc. · Section with this well →

Cherry Canyon3,413-178
Bone Spring6,086-2,851
Wolfcamp9,075-5,840
Rustler—
Morrow—
Mississippian—
Delaware—
Delaware—

10 TOPS · FIRST 8

Hay Denise State 08/0542-109-33605

0.0 KM · Chevron U. S. A. Inc. · Section with this well →

Lamar2,461775
Cherry Canyon3,410-174
Bone Spring6,059-2,823
Bone Spring6,059-2,823
Rustler—
Atoka—
Capitan—
Delaware—

14 TOPS · FIRST 8

Hay Denise State 08/0542-109-33609

0.0 KM · Chevron U. S. A. Inc. · Section with this well →

Cherry Canyon3,410-175
Bone Spring6,101-2,866
Wolfcamp9,110-5,875
Delaware—
Atoka—
Morrow—
Mississippian—
Delaware—

10 TOPS · FIRST 8

Hay Evelynn 17/2042-109-33571

0.2 KM · Chevron U. S. A. Inc. · Section with this well →

Lamar2,461785
Delaware2,706540
Cherry Canyon3,426-180
Bone Spring6,114-2,868
Wolfcamp9,137-5,891
Delaware—
Rustler—
Morrow—

10 TOPS · FIRST 8

Hay Evelynn 17/2042-109-33565

0.2 KM · Chevron U. S. A. Inc. · Section with this well →

Lamar2,458787
Delaware2,705540
Cherry Canyon3,425-180
Bone Spring6,106-2,861
Wolfcamp—
Atoka—
Delaware—
Mississippian—

11 TOPS · FIRST 8

Hay Evelynn 17/2042-109-33564

0.2 KM · Chevron U. S. A. Inc. · Section with this well →

Lamar2,458787
Delaware2,707538
Cherry Canyon3,424-179
Bone Spring6,100-2,855
Wolfcamp9,114-5,869
Atoka—
Morrow—
Rustler—

11 TOPS · FIRST 8

Hay Evelynn 17/2042-109-33563

0.2 KM · Chevron U. S. A. Inc. · Section with this well →

Lamar2,445798
Delaware2,701542
Cherry Canyon3,403-160
Bone Spring6,081-2,838
Wolfcamp9,085-5,842
Atoka—
Rustler—
Morrow—

12 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10933606, documented in the API reference.