WELL · 42-109-34038 · DISTRICT 8

Drake Unit #801H

Y

Culberson County · Ford West (Wolfcamp) field · Producing  · Horizontal

Drake Unit #801H (API 42-109-34038) is a horizontal well in Culberson County operated by Conocophillips Company, completed March 29, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 24, 2023, permitted to 10,500 ft.

Completion filings report 6 formation tops, including Delaware, Cherry Canyon, Bone Spring, Wolfcamp.

No lease production has been reported under this well’s leases.

Operator of record

Conocophillips Company

Midland, TX · P-5 Y, filed Dec 4, 2025 · 3,290 permits on file · (800) 332-9449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConocophillips Company
Production reportsConocophillips Companythrough Apr 2026
Latest permitConocophillips CompanyMay 24, 2023
10,500
total depth, ft
2
permits on file
May 24, 2023
last permit issued
Mar 29, 2024
completed
0
cumulative oil, bbl
4.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2024 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 29, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.924325, -104.064269

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Culberson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Drake Unit G-10-298509Ford, West (Wolfcamp)Conocophillips Company104.28MMar 2024 – Jul 2026

Gas, mcf lease total

Last 12 months 1,257,339 · prior 12 2,735,116(-54%)

0200K400K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conocophillips CompanyMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
890699-98DrillConocophillips CompanyAug 24, 2023May 24, 2023Jun 21, 202310,500
890699-99DrillConocophillips CompanyMay 16, 2023May 24, 2023Jun 21, 202310,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-298509————

Formation tops

As filed on W-2/G-1. Subsea from 3,124 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware2,528596
Cherry Canyon3,473-349
Bone Spring6,202-3,078
Bone SpringBONE SPRING 1ST7,153-4,029
Bone SpringBONE SPRING 2ND7,921-4,797
Bone SpringBONE SPRING 3RD8,940-5,816
Wolfcamp9,277-6,153
CapitanCAPITAN REEF——
DelawareFORD / DELAWARE——
Rustler——

Perforations

Perforated and open-hole intervals.

FromToType
10,50020,545Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,48414.751,500 S
7.62510,5049.8751,505 S
5.520,6236.751,675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 30, 2025Nov 14, 2024Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Drake Unit42-109-34039

0.0 KM · Conocophillips Company · Section with this well →

Delaware2,520604
Cherry Canyon3,470-346
Bone Spring6,187-3,063
Bone Spring7,141-4,017
Bone Spring7,905-4,781
Bone Spring8,929-5,805
Wolfcamp9,265-6,141
Capitan—

10 TOPS · FIRST 8

Drake Unit42-109-34040

0.0 KM · Conocophillips Company · Section with this well →

Delaware2,518606
Cherry Canyon3,470-346
Bone Spring6,183-3,059
Bone Spring7,125-4,001
Bone Spring7,897-4,773
Bone Spring8,917-5,793
Wolfcamp9,249-6,125
Delaware—

10 TOPS · FIRST 8

Mockingbird State WC42-109-33064

0.6 KM · Conocophillips Company · Section with this well →

Rustler7802,331
Delaware2,519592
Delaware2,519592
Cherry Canyon3,480-369
Bone Spring5,991-2,880
Wolfcamp9,255-6,144
Mississippian—
Strawn—

10 TOPS · FIRST 8

Mockingbird State WC42-109-33067

0.6 KM · Conocophillips Company · Section with this well →

Rustler3972,715
Delaware2,413699
Delaware2,413699
Cherry Canyon3,381-269
Bone Spring5,856-2,744
Wolfcamp9,087-5,975
Atoka—
Mississippian—

10 TOPS · FIRST 8

Mockingbird State WC42-109-33065

0.6 KM · Conocophillips Company · Section with this well →

Rustler3972,715
Delaware2,413699
Delaware2,413699
Cherry Canyon3,381-269
Bone Spring5,856-2,744
Wolfcamp9,087-5,975
Atoka—
Mississippian—

10 TOPS · FIRST 8

Mockingbird State WC42-109-33066

0.6 KM · Conocophillips Company · Section with this well →

Rustler3972,712
Delaware2,413696
Delaware2,413696
Cherry Canyon3,381-272
Bone Spring5,856-2,747
Wolfcamp9,087-5,978
Mississippian—
Morrow—

10 TOPS · FIRST 8

Hold EM WC42-109-33223

1.7 KM · Conocophillips Company · Section with this well →

Rustler3862,721
Delaware2,486621
Cherry Canyon3,456-349
Brushy Canyon4,658-1,551
Bone Spring6,036-2,929
Wolfcamp9,300-6,193
Atoka—
Delaware—

11 TOPS · FIRST 8

Hold EM WC42-109-33222

1.7 KM · Conocophillips Company · Section with this well →

Rustler3852,722
Delaware2,485622
Cherry Canyon3,459-352
Brushy Canyon4,670-1,563
Bone Spring6,029-2,922
Wolfcamp9,292-6,185
Delaware—
Atoka—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10934038, documented in the API reference.