TEXAS · WELLS · DALLAS COUNTY · DFW NORTH LEASE · API 42-113-30124 · DISTRICT 7C

DFW North #A 2HN

Plugged

Dallas County · Newark East (Barnett Shale) field  · Horizontal

Dfw North #A 2HN (API 42-113-30124) is a plugged horizontal well in Dallas County, plugged January 23, 2020, last operated by Tep Barnett USA LLC.

The RRC has issued one drilling permit (amended once), issued October 3, 2007, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Its lease has reported 1.3M mcf of gas since January 2008, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Aug 2013
Latest permitChesapeake Operating, Inc.Oct 3, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Oct 3, 2007
last permit issued
Jan 26, 2008
completed
0
cumulative oil, bbl
1.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH Aug 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 26, 2008
Shut in
—
Plugged
Jan 23, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
DFW North G-13-239530Newark, East (Barnett Shale)TEP Barnett USA, LLC101.3MJan 2008 – Aug 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2008 → Aug 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
646940-98DrillChesapeake Operating, Inc.Oct 18, 2007Oct 3, 2007Nov 19, 20079,000
646940-99DrillChesapeake Operating, Inc.Sep 28, 2007Oct 3, 2007—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 26, 2008DFW North G-13-239530Newark East (Barnett Shale)TEP Barnett USA LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 538 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,645-6,107
AtokaBASAL ATOKA7,568-7,030
BarnettLOWER BARNETT8,100-7,562

Perforations

Perforated and open-hole intervals.

FromToType
8,5359,317Perforated
9,61510,398Perforated
10,69611,479Perforated
11,77712,558Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,99312.25720 S
5.512,6458.751,790 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 22, 2008Apr 8, 2008Yes
00Oct 4, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/11330124, documented in the API reference.