WELL · 42-115-32011 · DISTRICT 8

Napper SA #6

Plugged

Dawson County · MTS (San Andres) field  · Vertical

Napper SA #6 (API 42-115-32011) is a plugged well in Dawson County, plugged May 4, 1994, last operated by Bta Oil Producers.

The RRC has issued 2 drilling permits in 1984, permitted to 5,100 ft.

Completion filings report one formation top, including San Andres.

Its lease has reported 7.32K barrels of oil and 2.99K mcf of gas since January 1993, last reporting in July 1995. The lease carries 15 wells, so these are lease totals, not this well alone.

Operator of record

BTA Oil Producers

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 5, 2007
Permits on file
684
Phone
(432) 682-3753

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBTA Oil Producers
Production reportsBTA Oil Producersthrough Apr 1995
Latest permitBTA Oil ProducersSep 18, 1984
5,100
total depth, ft
2
permits on file
Sep 18, 1984
last permit issued
Nov 3, 1987
completed
7.32K
cumulative oil, bbl
2.99K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 3, 1987
Shut in
—
Plugged
May 4, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Napper "SA" O-11-65020MTS (San Andres)BTA Oil Producers157.32K2.99KJan 1993 – Jul 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BTA Oil ProducersJan 1993 → Mar 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
251877-99DrillBTA Oil ProducersSep 17, 1984Sep 18, 1984—5,100
241669-99DrillBTA Oil ProducersMay 11, 1984Jun 6, 1984—5,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 3, 1987Napper SA O-11-65020MTS (San Andres)BTA Oil ProducersPlugged—
Jun 18, 1984Napper SA O-11-64810Welch SE. (San Andres)BTA Oil ProducersPlugged—
Jun 18, 1984Napper SA O-11-65020MTS (San Andres)BTA Oil ProducersPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,074 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,330-1,256

Perforations

Perforated and open-hole intervals.

FromToType
4,9064,944Perforated
4,9064,944Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540212.25450 sx
5.54,9067.875500 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 1987Nov 12, 1987—
00Nov 21, 1987Jun 28, 1984—
00Oct 3, 1984Jun 28, 1984—
00Oct 2, 1984Jun 28, 1984—
00Jul 16, 1984Jun 28, 1984—
00Jul 14, 1984Jun 28, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

22.6K
bbl, last 12 reported months
191K
bbl, all reported
Aug 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064281H-1 InjectionPlugged May 17, 19945001,0004,906–4,944

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 22,555 · prior 12 12,140(+86%)

02K4K6K19921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/11532011, documented in the API reference.