WELL · 42-115-33149 · DISTRICT 8

Horne #2

N

Dawson County · Ackerly North (Canyon 9166) field  · Vertical

Horne #2 (API 42-115-33149) is a well in Dawson County operated by Exco/Hgi JV Assets LLC, completed April 26, 2006.

The RRC has issued 2 drilling permits between 2005 and 2013, permitted to 9,600 ft.

Completion filings report 4 formation tops, including Spraberry, Jomill, Dean, Canyon.

Its 2 leases have reported 116K barrels of oil and 48.1K mcf of gas since April 2006, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Exco/Hgi JV Assets LLC

Dallas, TX · P-5 Y, filed Oct 13, 2017 · 31 permits on file · (888) 788-3781

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco/Hgi JV Assets LLC
Production reportsBirch Operations, Inc.through Apr 2026
Latest permitExco/Hgi JV Assets, LLCApr 22, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,600
total depth, ft
2
permits on file
Apr 22, 2013
last permit issued
Apr 26, 2006
completed
116K
cumulative oil, bbl
48.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 26, 2006
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Horne 2 Lease O-11-70073Ackerly, North (Dean Sand)Birch Operations, Inc.178.4K34.7KMay 2013 – Jul 2026
Horne O-11-68929Ackerly, North (Canyon 9166)Exco/Hgi JV Assets, LLC137.8K13.4KApr 2006 – Jan 2014

Oil, barrels lease total

Last 12 months 1,036 · prior 12 4,537(-77%)

05001K202420252026

Gas, mcf lease total

Last 12 months 241 · prior 12 842(-71%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Apr 2006 → Jan 2012
  2. 2Exco/Hgi JV Assets, LLCMay 2013 → Jun 2014
  3. 3Compass Energy Operating, LLCJul 2014 → Feb 2023
  4. 4Birch Operations, Inc.Mar 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
760599-99RecompletionExco/Hgi JV Assets, LLCApr 12, 2013Apr 22, 2013Apr 9, 20139,500
607948-99DrillExco Resources, Inc.Oct 14, 2005Nov 22, 2005Feb 6, 20069,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68929————
—— O-11-70073————

Formation tops

As filed on W-2/G-1. Subsea from 2,823 ft elevation.Download CSV →

FormationMD ftSubsea
Spraberry6,852-4,029
Jomill7,764-4,941
Dean8,205-5,382
Canyon9,162-6,339

Perforations

Perforated and open-hole intervals.

FromToType
8,2208,404Perforated
9,2509,254Perforated
9,2609,254Perforated
9,2829,286Perforated
9,2909,294Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37534617.5390 S
9.6253,51012.51,335 S
5.59,4528.751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2014May 31, 2013—
00Sep 12, 2006May 4, 2006Yes
00May 15, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/11533149, documented in the API reference.