TEXAS · WELLS · DENTON COUNTY · MERRITT, W. A. LEASE · API 42-121-30524 · DISTRICT 7C
Merritt W. A. #2
Denton County · Monteath (Atoka Upper) field · Vertical
Merritt W. A. #2 (API 42-121-30524) is a plugged well in Denton County, plugged October 4, 2010, last operated by J-W Operating CO..
The RRC has issued one drilling permit, issued July 13, 1990, permitted to 6,500 ft.
It was permitted by Enre Corp. and has since transferred to J-W Operating CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Preg Shale, Atoka.
Operator of record
Permitted by Enre Corp.; the EWA schedule now lists a different operator.
- Based in
- Addison, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 30, 2019
- Permits on file
- 350
- Phone
- (972) 233-8191
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J-W Operating Co. |
| Production reports | Enre, L.P.through Nov 2003 |
| Latest permit | Enre Corp.Jul 13, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- Jul 13, 1990
- last permit issued
- Mar 15, 1991
- completed
- 0
- cumulative oil, bbl
- 168K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 15, 1991
- Shut in
- —
- Plugged
- Oct 4, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Merritt, W. A. G-13-137985 | Monteath (Atoka, Upper) | J-W Operating Co. | 1 | 0 | 168K | Jan 1993 – Oct 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enre Corp.Jan 1993 → Jan 2001
- 2Enre, L.P.Feb 2001 → Nov 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 375439-99 | Drill | Enre Corp. | Jul 12, 1990 | Jul 13, 1990 | Oct 26, 1990 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 15, 1991 | Merritt W. A. G-13-137985 | Monteath (Atoka Upper) | J-W Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 774 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,571 | 5,576 | Perforated |
| 5,622 | 5,636 | Perforated |
| 5,654 | 5,657 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 921 | 12.25 | 425 S |
| 4.5 | 6,282 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 1991 | Apr 5, 1991 | Yes |
| 00 | May 7, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-121-30524 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-121-30524 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12130524, documented in the API reference.