TEXAS · WELLS · DENTON COUNTY · GRIFFIN, S. H. ESTATE LEASE · API 42-121-30528 · DISTRICT 7C

Griffin S. H. Estate #1

Y

Denton County · Newark East (Barnett Shale) field · Producing  · Vertical

Griffin S. H. Estate #1 (API 42-121-30528) is a well in Denton County operated by Bkv Barnett LLC, completed November 28, 1990 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 24, 1990, permitted to 8,420 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Bkv Barnett LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Parks, Caddo, Preg. Shale, Atoka.

No lease production has been reported under this well’s leases.

Operator of record

BKV Barnett LLC

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
143
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV Barnett LLC
Production reportsBKV Barnett, LLCthrough Apr 2026
Latest permitMitchell Energy CorporationSep 24, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,420
total depth, ft
1
permits on file
Sep 24, 1990
last permit issued
Nov 28, 1990
completed
0
cumulative oil, bbl
1.44M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 28, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Griffin, S. H. Estate G-13-136979Newark, East (Barnett Shale)BKV Barnett, LLC101.44MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 5,625 · prior 12 4,959(+13%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJan 1993 → Dec 2000
  2. 2Mitchell Energy Company L.P.Jan 2001 → Mar 2002
  3. 3Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  4. 4Devon Energy Production Co, L.P.Aug 2004 → Sep 2020
  5. 5BKV Barnett, LLCOct 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
378353-99DrillMitchell Energy CorporationSep 24, 1990Sep 24, 1990Sep 28, 19908,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 28, 1990Griffin S. H. Estate G-13-136979Newark East (Barnett Shale)BKV Barnett LLCProducing8,420

Formation tops

As filed on W-2/G-1. Subsea from 727 ft elevation.Download CSV →

FormationMD ftSubsea
Parks4,022-3,295
Caddo4,930-4,203
Preg. Shale5,202-4,475
Atoka5,384-4,657
Grant5,973-5,246
Barnett7,950-7,223

Perforations

Perforated and open-hole intervals.

FromToType
7,6637,797Perforated
7,9437,989Perforated
7,9528,278Perforated
8,0458,078Perforated
8,0808,267Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,13212.25725 S
4.58,4187.875775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 9, 2001Feb 23, 2001—
00Apr 26, 1991Jan 14, 1991Yes
00Feb 27, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12130528, documented in the API reference.