TEXAS · WELLS · DENTON COUNTY · MERRITT, MARCIA LEASE · API 42-121-30630 · DISTRICT 7C

Merritt Marcia #4

Shut in

Denton County · Newark East (Barnett Shale) field · Producing  · Directional · Sidetrack

Merritt Marcia #4 (API 42-121-30630) is a well in Denton County operated by Eagleridge Operating LLC, completed September 22, 2004 and listed as producing on the RRC schedule, shut in December 1, 2022.

The RRC has issued 2 drilling permits between 1996 and 2004, permitted to 8,110 ft.

It was permitted by J-W Operating CO. and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Caddo, Atoka, Bend, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

Eagleridge Operating LLC

Permitted by J-W Operating Co.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Nov 2022
Latest permitJ-W Operating Co.May 25, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,110
total depth, ft
2
permits on file
May 25, 2004
last permit issued
Sep 22, 2004
completed
0
cumulative oil, bbl
1.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 22, 2004
Shut in
Dec 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Merritt, Marcia G-13-159514Newark, East (Barnett Shale)Eagleridge Operating, LLC101.64MMay 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enre Corp.May 1996 → Jan 2001
  2. 2Enre, L.P.Feb 2001 → Jun 2001
  3. 3J-W Operating Co.Sep 2004 → Jun 2016
  4. 4Aethon Energy Operating LLCJul 2016 → Oct 2018
  5. 51849 Energy Partners Oprtng, LLCNov 2018 → Feb 2022
  6. 6Eagleridge Operating, LLCJun 2022 → Nov 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
546120-99Recompletion · sidetrackJ-W Operating Co.May 25, 2004May 25, 2004—9,900
444643-99DrillEnre Corp.Feb 9, 1996Feb 21, 1996Apr 9, 19968,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 22, 2004Merritt Marcia G-13-159514Newark East (Barnett Shale)Eagleridge Operating LLCProducing · shut in Dec 1, 20228,110
Sep 22, 2004Merritt Marcia G-13-159514Newark East (Barnett Shale)Eagleridge Operating LLCProducing · shut in Dec 1, 20228,110

Formation tops

As filed on W-2/G-1. Subsea from 787 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,182-3,395
Caddo4,300-3,513
CaddoCADDO CONGLOMERATE4,460-3,673
AtokaATOKA CONGLOMERATE5,560-4,773
BendBEND CONGLOMERATE6,120-5,333
Marble Falls6,980-6,193
Marble Falls7,120-6,333
BarnettUPPER BARNETT7,400-6,613
BarnettBARNETT SHALE7,616-6,829
BarnettLOWER BARNETT7,760-6,973

Perforations

Perforated and open-hole intervals.

FromToType
7,4267,486Perforated
7,6577,932Perforated
7,7647,984Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62597912.25500 S
4.53,0657.875280 S
5.58,0677.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 18, 2005Nov 15, 2004Yes
00Sep 23, 1996Aug 7, 1996Yes
00Aug 28, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12130630, documented in the API reference.