TEXAS · WELLS · DENTON COUNTY · LANGLEY UNIT LEASE · API 42-121-30816 · DISTRICT 7C

Langley Unit #2

Plugged

Denton County · Newark East (Barnett Shale) field  · Vertical

Langley Unit #2 (API 42-121-30816) is a plugged well in Denton County, plugged January 23, 2026, last operated by Lime Rock Resources IV-A L.P..

The RRC has issued one drilling permit, issued August 25, 2000, permitted to 8,875 ft.

It was permitted by Dallas Production, Inc. and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Cordell, Marble Falls, Viola.

Its lease has reported 12.5K barrels of oil and 795K mcf of gas since November 2000, with no volume in the three years through April 2026.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Mar 2019
Latest permitDallas Production, Inc.Aug 25, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,875
total depth, ft
1
permits on file
Aug 25, 2000
last permit issued
Nov 5, 2000
completed
12.5K
cumulative oil, bbl
795K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2000 THROUGH Mar 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 5, 2000
Shut in
—
Plugged
Jan 23, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Langley Unit G-13-180619Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.112.5K795KNov 2000 – Mar 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dallas Production, Inc.Dec 2000 → Aug 2002
  2. 2Burlington Resources O & G Co LPSep 2002 → Oct 2018
  3. 3Lime Rock Resources IV-a, L.P.Nov 2018 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498864-99DrillDallas Production, Inc.Aug 25, 2000Aug 25, 2000Sep 22, 20008,875

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 5, 2000Langley Unit G-13-180619Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 780 ft elevation.Download CSV →

FormationMD ftSubsea
Cordell6,100-5,320
Marble Falls7,060-6,280
Viola8,560-7,780

Perforations

Perforated and open-hole intervals.

FromToType
7,6747,800Perforated
7,9408,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,01812.25480 S
5.58,6417.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 27, 2001Dec 18, 2000Yes
00Feb 7, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12130816, documented in the API reference.