TEXAS · WELLS · DENTON COUNTY · DCCO 4 LEASE · API 42-121-30846 · DISTRICT 7C

Dcco 4 #5

Y

Denton County · Newark East (Barnett Shale) field · Producing  · Directional

Dcco 4 #5 (API 42-121-30846) is a well in Denton County operated by Bkv Barnett LLC, completed February 23, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 13, 2000, permitted to 8,415 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Bkv Barnett LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Pregnant Shale, Barnett.

Its lease has reported 1.67M mcf of gas since February 2001, last reporting volume in April 2026.

Operator of record

BKV Barnett LLC

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
143
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV Barnett LLC
Production reportsBKV Barnett, LLCthrough Apr 2026
Latest permitMitchell Energy CorporationOct 13, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,415
total depth, ft
1
permits on file
Oct 13, 2000
last permit issued
Feb 23, 2001
completed
0
cumulative oil, bbl
1.67M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2001 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 23, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dcco 4 G-13-183244Newark, East (Barnett Shale)BKV Barnett, LLC101.67MFeb 2001 – Apr 2026

Gas, mcf lease total

Last 12 months 14,085 · prior 12 14,767(-5%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy Company L.P.Apr 2001 → Mar 2002
  2. 2Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  3. 3Devon Energy Production Co, L.P.Aug 2004 → Sep 2020
  4. 4BKV Barnett, LLCOct 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500736-99DrillMitchell Energy CorporationOct 13, 2000Oct 13, 2000Nov 16, 20008,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 23, 2001Dcco 4 G-13-183244Newark East (Barnett Shale)BKV Barnett LLCProducing8,415

Formation tops

As filed on W-2/G-1. Subsea from 753 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,141-3,388
Pregnant Shale4,806-4,053
BarnettBARNETT SHALE7,774-7,021

Perforations

Perforated and open-hole intervals.

FromToType
7,7748,268Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,08712.25550 S
5.58,4157.875624 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 9, 2026Dec 15, 2025—
00Sep 5, 2001Jun 11, 2001Yes
00Jul 26, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12130846, documented in the API reference.