TEXAS · WELLS · DENTON COUNTY · CADDELL LEASE · API 42-121-30944 · DISTRICT 7C

Caddell #3

Shut in

Denton County · Newark East (Barnett Shale) field · Producing  · Vertical

Caddell #3 (API 42-121-30944) is a well in Denton County operated by Lime Rock Resources IV-A L.P., completed May 3, 2001 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued 2 drilling permits between 2001 and 2009, permitted to 8,546 ft.

It was permitted by Burlington Resources O & G CO LP and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Cordell, Marble Falls, Viola.

No lease production has been reported under this well’s leases.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Burlington Resources O & G Co LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Apr 2026
Latest permitBurlington Resources O & G Co LPMar 19, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,546
total depth, ft
2
permits on file
Mar 19, 2009
last permit issued
May 3, 2001
completed
0
cumulative oil, bbl
816K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 3, 2001
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caddell G-13-182903Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.10816KMay 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 3,904 · prior 12 4,080(-4%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dallas Production, Inc.May 2001 → Aug 2002
  2. 2Burlington Resources O & G Co LPSep 2002 → Oct 2018
  3. 3Lime Rock Resources IV-a, L.P.Nov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
679358-99RecompletionBurlington Resources O & G Co LPMar 11, 2009Mar 19, 2009—8,546
506545-99DrillDallas Production, Inc.Mar 15, 2001Mar 15, 2001Mar 27, 20018,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 3, 2001Caddell G-13-182903Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Producing · shut in Aug 1, 20268,546

Formation tops

As filed on W-2/G-1. Subsea from 805 ft elevation.Download CSV →

FormationMD ftSubsea
Cordell6,060-5,255
Marble Falls7,384-6,579
Viola8,512-7,707

Perforations

Perforated and open-hole intervals.

FromToType
7,7167,830Perforated
8,0638,468Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62598812.25455 S
5.58,5397.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 16, 2001Jun 18, 2001Yes
00Jun 27, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12130944, documented in the API reference.