WELL · 42-121-31411 · DISTRICT 9
Springside-A #1
Denton County · Newark East (Barnett Shale) field · Vertical
Springside-A #1 (API 42-121-31411) is a plugged well in Denton County, plugged December 9, 2025, last operated by Expro Engineering Inc..
The RRC has issued one drilling permit (amended once), issued February 6, 2002, permitted to 9,400 ft.
It was permitted by Hess, Jerry Operating CO. and has since transferred to Expro Engineering Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Barnett, Viola, Marble Falls.
Operator of record
Permitted by Hess, Jerry Operating Co.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 60
- Phone
- (817) 624-8425
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Expro Engineering Inc. |
| Production reports | Expro Engineering, Inc.through Nov 2025 |
| Latest permit | Hess, Jerry Operating Co.Feb 6, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,400
- total depth, ft
- 2
- permits on file
- Feb 6, 2002
- last permit issued
- Jun 4, 2002
- completed
- 0
- cumulative oil, bbl
- 314K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2002 THROUGH Dec 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 4, 2002
- Shut in
- —
- Plugged
- Dec 9, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Springside-A G-13-190531 | Newark, East (Barnett Shale) | Expro Engineering, Inc. | 1 | 0 | 314K | Jun 2002 – Dec 2025 |
Gas, mcf lease total
Last 12 months 2,491 · prior 12 3,373(-26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hess, Jerry Operating Co.Dec 2003 → Nov 2005
- 2Dune Operating CompanyDec 2005 → Aug 2008
- 3Pioneer Natural Res. USA, Inc.Sep 2008 → Jul 2012
- 4Eagleridge Operating, LLCAug 2012 → Dec 2020
- 5Tidewater Resources CorporationJan 2021 → Feb 2025
- 6Expro Engineering, Inc.Mar 2025 → Nov 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 517378-98 | Drill | Hess, Jerry Operating Co. | Apr 10, 2002 | Feb 6, 2002 | May 14, 2002 | 9,400 |
| 517378-99 | Drill | Hess, Jerry Operating Co. | Feb 5, 2002 | Feb 6, 2002 | — | 8,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-190531 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 619 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,895 | 8,051 | Perforated |
| 8,117 | 8,808 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,308 | 12.25 | 610 S |
| 5.5 | 8,116 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2007 | Sep 10, 2002 | Yes |
| 00 | Mar 29, 2004 | Jan 20, 2004 | Yes |
| 00 | Oct 8, 2002 | Sep 10, 2002 | Yes |
| 00 | Sep 26, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-121-31411 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-121-31411 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12131411, documented in the API reference.