WELL · 42-121-31686 · DISTRICT 9

Hughston Unit #5

Shut in

Denton County · Newark East (Barnett Shale) field · Producing  · Vertical

Hughston Unit #5 (API 42-121-31686) is a well in Denton County operated by Lime Rock Resources IV-A L.P., completed November 25, 2002 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued October 4, 2002, permitted to 8,665 ft.

It was permitted by Dallas Production, Inc. and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 7 formation tops, including Bend, Marble Falls, Up. Barnett, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Apr 2026
Latest permitDallas Production, Inc.Oct 4, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,665
total depth, ft
1
permits on file
Oct 4, 2002
last permit issued
Nov 25, 2002
completed
0
cumulative oil, bbl
509K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 25, 2002
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hughston Unit G-13-193364Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.10509KNov 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 5,679 · prior 12 6,579(-14%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPNov 2002 → Oct 2018
  2. 2Lime Rock Resources IV-a, L.P.Nov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
524349-99DrillDallas Production, Inc.Oct 4, 2002Oct 4, 2002Oct 29, 20028,875

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 25, 2002Hughston Unit G-13-193364Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Producing · shut in Aug 1, 20268,665

Formation tops

As filed on W-2/G-1. Subsea from 771 ft elevation.Download CSV →

FormationMD ftSubsea
BendBEND CONGL.5,129-4,358
BendBEND CONGLOMERATE5,129-4,358
Marble Falls7,458-6,687
Up. Barnett7,790-7,019
BarnettUPPER BARNETT7,790-7,019
Forestburg7,864-7,093
BarnettLOWER BARNETT8,106-7,335
Lwr. Barnett8,106-7,335
Viola8,562-7,791

Perforations

Perforated and open-hole intervals.

FromToType
7,7927,862Perforated
8,1128,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,08512.25690 S
5.58,6427.875560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 2003Feb 10, 2003—
00Apr 17, 2003Dec 6, 2002Yes
00Mar 18, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12131686, documented in the API reference.