TEXAS · WELLS · DENTON COUNTY · BANKS "A" UNIT LEASE · API 42-121-31799 · DISTRICT 7C

Banks a Unit #5

Shut in

Denton County · Newark East (Barnett Shale) field · Producing  · Vertical

Banks A Unit #5 (API 42-121-31799) is a well in Denton County operated by Lime Rock Resources IV-A L.P., completed May 15, 2003 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued January 27, 2003, permitted to 8,374 ft.

It was permitted by Burlington Resources O & G CO LP and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Barnett, Viola.

Its lease has reported 8.14K barrels of oil and 1.16M mcf of gas since May 2003, last reporting volume in April 2026.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Burlington Resources O & G Co LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Apr 2026
Latest permitBurlington Resources O & G Co LPJan 27, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,374
total depth, ft
1
permits on file
Jan 27, 2003
last permit issued
May 15, 2003
completed
8.14K
cumulative oil, bbl
1.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 2003
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Banks "a" Unit G-13-195653Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.18.14K1.16MMay 2003 – Apr 2026

Gas, mcf lease total

Last 12 months 19,357 · prior 12 26,400(-27%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPMay 2003 → Oct 2018
  2. 2Lime Rock Resources IV-a, L.P.Nov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527651-99DrillBurlington Resources O & G Co LPJan 24, 2003Jan 27, 2003Apr 9, 20039,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 15, 2003Banks a Unit G-13-195653Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Producing · shut in Aug 1, 20268,374

Formation tops

As filed on W-2/G-1. Subsea from 715 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo5,218-4,503
BarnettUPPER BARNETT7,515-6,800
Viola8,274-7,559

Perforations

Perforated and open-hole intervals.

FromToType
7,5208,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62590112.25430 S
5.58,3727.875605 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 6, 2003Jul 15, 2003Yes
00Jul 29, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12131799, documented in the API reference.