TEXAS · WELLS · DENTON COUNTY · WOLSKI LEASE · API 42-121-32187 · DISTRICT 7C
Wolski #1R
Denton County · Newark East (Barnett Shale) field · Directional
Wolski #1R (API 42-121-32187) is a plugged well in Denton County, plugged June 11, 2009, last operated by Joint Resources Company.
The RRC has issued 3 drilling permits (amended once) between 2003 and 2007, permitted to 9,400 ft.
Completion filings report 3 formation tops, including Atoka, Oil Creek, Barnett.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 9, 2026
- Permits on file
- 241
- Phone
- (817) 289-1414
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | XTO Energy Inc.through Oct 2008 |
| Latest permit | Joint Resources CompanyJul 30, 2007 |
- 9,400
- total depth, ft
- 4
- permits on file
- Jul 30, 2007
- last permit issued
- Feb 20, 2004
- completed
- 0
- cumulative oil, bbl
- 62.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jun 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 20, 2004
- Shut in
- —
- Plugged
- Jun 11, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wolski G-13-202290 | Newark, East (Barnett Shale) | Joint Resources Company | 1 | 0 | 62.3K | Feb 2004 – Jun 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Joint Resources CompanyFeb 2004 → Feb 2006
- 2Stroud Energy, Ltd.Mar 2006 → May 2006
- 3Range Production CompanyJul 2006 → Oct 2006
- 4XTO Energy Inc.Jan 2008 → Oct 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 642575-99 | Recompletion | Joint Resources Company | Jul 16, 2007 | Jul 30, 2007 | — | 9,400 |
| 543903-99 | Recompletion | Joint Resources Company | Mar 31, 2004 | May 6, 2004 | — | 6,995 |
| 539528-98 | Drill | Joint Resources Company | Mar 23, 2004 | Mar 26, 2004 | Dec 4, 2003 | 9,400 |
| 539528-99 | Drill | Joint Resources Company | Dec 10, 2003 | Dec 11, 2003 | — | 9,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 20, 2004 | Wolski G-13-202290 | Newark East (Barnett Shale) | Joint Resources Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 695 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,006 | 9,030 | Perforated |
| 9,062 | 9,098 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,381 | 12.25 | 625 S |
| 5.5 | 9,228 | 7.875 | 275 S |
| 5.5 | — | 7.875 | 510 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 2005 | May 28, 2004 | Yes |
| 00 | Oct 17, 2005 | May 28, 2004 | Yes |
| 00 | Jul 21, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-121-32187 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-121-32187 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12132187, documented in the API reference.