WELL · 42-121-32737 · DISTRICT 9
Taylor Sybil #5H
Denton County · Newark East (Barnett Shale) field · Producing · Horizontal
Taylor Sybil #5H (API 42-121-32737) is a horizontal well in Denton County operated by Bkv Barnett II LLC, completed June 6, 2006 and listed as producing on the RRC schedule, shut in October 1, 2022.
The RRC has issued one drilling permit, issued December 6, 2005, permitted to 8,661 ft.
It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Bkv Barnett II LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Pregnant Shale, Pennsylvanian, L Barnett, L. Barnett.
Its 3 leases have reported 7.9K barrels of oil and 704K mcf of gas since June 2006, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 2, 2025
- Permits on file
- 5
- Phone
- (940) 394-2000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bedrock Production LLC |
| Production reports | Bedrock Production, LLCthrough Jul 2023 |
| Latest permit | Encana Oil & Gas(usa) Inc.Dec 6, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,661
- total depth, ft
- 1
- permits on file
- Dec 6, 2005
- last permit issued
- Jun 6, 2006
- completed
- 7.9K
- cumulative oil, bbl
- 704K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 6, 2006
- Shut in
- Oct 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Taylor, Sybil G-13-296952 | Newark, East (Barnett Shale) | BKV Barnett II, LLC | 1 | 0 | 76 | Jun 2023 – Jul 2026 |
| Taylor, Sybil O-13-30843 | Newark, East (Barnett Shale) | Bedrock Production, LLC | 1 | 7.9K | 538K | Jul 2007 – Jun 2024 |
| Taylor, Sybil G-13-224824 | Newark, East (Barnett Shale) | Encana Oil & Gas(usa) Inc. | 1 | 0 | 166K | Jun 2006 – Oct 2007 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Encana Oil & Gas(usa) Inc.Jul 2006 → Dec 2011
- 2Enervest Operating, L.L.C.Jan 2012 → Nov 2018
- 3Bedrock Production, LLCApr 2019 → Jul 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 610464-99 | Drill | Encana Oil & Gas(usa) Inc. | Dec 2, 2005 | Dec 6, 2005 | Apr 21, 2006 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 6, 2006 | Taylor Sybil G-13-296952 | Newark East (Barnett Shale) | BKV Barnett II LLC | Producing · shut in Oct 1, 2022 | 8,661 |
| Aug 7, 2006 | Taylor Sybil O-13-30843 | Newark East (Barnett Shale) | Bedrock Production LLC | Not on Schedule | — |
| Jun 6, 2006 | Taylor Sybil G-13-224824 | Newark East (Barnett Shale) | Encana Oil & Gas(usa) Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 760 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pregnant Shale | 5,962 | -5,202 |
| PennsylvanianPENN DETRITUS | 6,904 | -6,144 |
| L Barnett | 8,411 | -7,651 |
| L. Barnett | 8,411 | -7,651 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,900 | 9,440 | Perforated |
| 8,900 | 9,940 | Perforated |
| 8,900 | 11,440 | Perforated |
| 9,690 | 9,940 | Perforated |
| 10,190 | 10,440 | Perforated |
| 10,190 | 10,940 | Perforated |
| 10,690 | 10,940 | Perforated |
| 11,190 | 11,440 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,146 | 12.25 | 630 S |
| 5.5 | 11,518 | 8.75 | 500 S |
| 4.5 | 11,518 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 29, 2024 | Feb 16, 2024 | Yes |
| 00 | Oct 24, 2007 | Jul 27, 2007 | — |
| 00 | Oct 2, 2007 | — | — |
| 00 | Apr 12, 2007 | Sep 25, 2006 | Yes |
| 00 | Feb 26, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-121-32737 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-121-32737 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12132737, documented in the API reference.