TEXAS · WELLS · DENTON COUNTY · MADEWELL LEASE · API 42-121-33064 · DISTRICT 7C

Madewell #1H

Shut in

Denton County · Newark East (Barnett Shale) field · Producing  · Horizontal

Madewell #1H (API 42-121-33064) is a horizontal well in Denton County operated by Bkv North Texas LLC, completed May 23, 2008 and listed as producing on the RRC schedule, shut in June 1, 2024.

The RRC has issued one drilling permit (amended 3 times), issued March 16, 2007, permitted to 8,538 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Marble Falls, Comyn, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
22
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Mar 16, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,538
total depth, ft
4
permits on file
Mar 16, 2007
last permit issued
May 23, 2008
completed
0
cumulative oil, bbl
588K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 23, 2008
Shut in
Jun 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Madewell G-13-251506Newark, East (Barnett Shale)BKV North Texas, LLC10588KMay 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 6,975 · prior 12 11(+63309%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.May 2008 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
634958-96DrillXTO Energy Inc.Jul 1, 2009Mar 16, 2007Oct 31, 200710,000
634958-97DrillXTO Energy Inc.Mar 12, 2008Mar 16, 2007Oct 31, 200710,000
634958-98DrillXTO Energy Inc.Oct 15, 2007Mar 16, 2007—10,000
634958-99DrillJoint Resources CompanyMar 9, 2007Mar 16, 2007—9,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 23, 2008Madewell G-13-251506Newark East (Barnett Shale)BKV North Texas LLCProducing · shut in Jun 1, 20248,538

Formation tops

As filed on W-2/G-1. Subsea from 599 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls7,717-7,118
Comyn7,989-7,390
BarnettUPPER BARNETT8,081-7,482

Perforations

Perforated and open-hole intervals.

FromToType
9,17610,575Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60012.25515 S
5.510,6408.75850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 19, 2009Apr 27, 2009Yes
00Oct 9, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12133064, documented in the API reference.