TEXAS · WELLS · DENTON COUNTY · METHODIST CHILDREN'S UNIT LEASE · API 42-121-33569 · DISTRICT 7C
Methodist Children S Unit #2H
Denton County · Newark East (Barnett Shale) field · Temp Abandoned · Horizontal
Methodist Children S Unit #2H (API 42-121-33569) is a horizontal well in Denton County operated by Eagleridge Operating LLC, completed February 3, 2009 and listed as temp abandoned on the RRC schedule, shut in May 1, 2025.
The RRC has issued one drilling permit (amended twice), issued September 10, 2008, permitted to 8,584 ft.
It was permitted by Carrizo Oil & Gas, Inc. and has since transferred to Eagleridge Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Base Cretaceous (marker), Barnett.
Its lease has reported 479K mcf of gas since October 2008, last reporting volume in April 2025.
Operator of record
Permitted by Carrizo Oil & Gas, Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 129
- Phone
- (214) 295-6704
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagleridge Operating LLC |
| Production reports | Eagleridge Operating, LLCthrough Apr 2025 |
| Latest permit | Carrizo Oil & Gas, Inc.Nov 18, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,584
- total depth, ft
- 3
- permits on file
- Nov 18, 2008
- last permit issued
- Feb 3, 2009
- completed
- 0
- cumulative oil, bbl
- 479K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · FEB 2010 THROUGH APR 2025
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 3, 2009
- Shut in
- May 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Methodist Children's Unit G-13-249019 | Newark, East (Barnett Shale) | Eagleridge Operating, LLC | 1 | 0 | 479K | Oct 2008 – Apr 2025 |
Gas, mcf lease total
Last 12 months 0 · prior 12 3,437(-100%)
Wells named Methodist Children S Unit
Eagleridge Operating LLC's other wells filed under this lease name in Denton County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Carrizo Oil & Gas, Inc.Feb 2010 → Apr 2012
- 2Arp Barnett, LLCMay 2012 → Nov 2018
- 3Sage Natural Resources LLCDec 2018 → Jan 2025
- 4Eagleridge Operating, LLCFeb 2025 → Apr 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 669545-97 | Drill | Carrizo Oil & Gas, Inc. | Apr 6, 2010 | Nov 18, 2008 | Sep 22, 2008 | 9,000 |
| 669545-98 | Drill | Carrizo Oil & Gas, Inc. | Oct 1, 2008 | Nov 18, 2008 | Sep 22, 2008 | 9,000 |
| 669545-99 | Drill | Carrizo Oil & Gas, Inc. | Aug 20, 2008 | Sep 10, 2008 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 3, 2009 | Methodist Children S Unit G-13-249019 | Newark East (Barnett Shale) | Eagleridge Operating LLC | Temp Abandoned · shut in May 1, 2025 | 8,584 |
Formation tops
As filed on W-2/G-1. Subsea from 619 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 1,600 | -981 |
| BarnettTOP UPPER BARNETT SHALE | 8,196 | -7,577 |
| BarnettTOP LOWER BARNETT SHALE | 8,595 | -7,976 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,579 | 11,398 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,750 | 12.25 | 480 S |
| 5.5 | 11,510 | 8.75 | 1,064 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 2010 | Jun 7, 2010 | — |
| 00 | Mar 22, 2010 | Mar 11, 2009 | Yes |
| 00 | Jul 9, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-121-33569 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-121-33569 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12133569, documented in the API reference.