TEXAS · WELLS · DENTON COUNTY · JAMES LOCHHEAD UNIT LEASE · API 42-121-33795 · DISTRICT 7C

James Lochhead Unit #4H

Plugged

Denton County · Newark East (Barnett Shale) field  · Horizontal

James Lochhead Unit #4H (API 42-121-33795) is a plugged horizontal well in Denton County, plugged June 1, 2026, last operated by Lime Rock Resources IV-A L.P..

The RRC has issued one drilling permit, issued August 13, 2009, permitted to 9,000 ft.

It was permitted by Burlington Resources O & G CO LP and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 2 formation tops, including Barnett, Forestburg.

Its lease has reported 10.6K barrels of oil and 590K mcf of gas since January 2010, last reporting volume in April 2025.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Burlington Resources O & G Co LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Apr 2025
Latest permitBurlington Resources O & G Co LPAug 13, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Aug 13, 2009
last permit issued
Mar 31, 2010
completed
10.6K
cumulative oil, bbl
590K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Apr 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 31, 2010
Shut in
—
Plugged
Jun 1, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
James Lochhead Unit G-13-255355Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.110.6K590KJan 2010 – Apr 2025

Gas, mcf lease total

Last 12 months 0 · prior 12 2,609(-100%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPJul 2010 → Oct 2018
  2. 2Lime Rock Resources IV-a, L.P.Nov 2018 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683869-99DrillBurlington Resources O & G Co LPAug 6, 2009Aug 13, 2009Dec 19, 20099,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 31, 2010James Lochhead Unit G-13-255355Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 829 ft elevation.Download CSV →

FormationMD ftSubsea
BarnettUPPER BARNETT7,640-6,811
Forestburg7,735-6,906
ForestburgFORESTBURG LS7,735-6,906
BarnettLOWER BARNETT7,840-7,011

Perforations

Perforated and open-hole intervals.

FromToType
9,55112,628Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,06312.25450 S
5.512,7058.751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 19, 2010Sep 3, 2010—
00Apr 16, 2010Mar 16, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12133795, documented in the API reference.