WELL · 42-123-31687 · DISTRICT 2
Langston-Eliot #1
DE Witt County · Terryville SW. (9920) field · Vertical
Langston-Eliot #1 (API 42-123-31687) is a plugged well in De Witt County, plugged December 9, 2005, last operated by Christopher Oil & Gas Inc.
The RRC has issued 2 drilling permits between 1991 and 1993, permitted to 10,500 ft.
Completion filings report 3 formation tops, including Yegua, Jackson, Wilcox.
Operator of record
- Based in
- Fulshear, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 10, 2014
- Permits on file
- 112
- Phone
- (254) 744-3334
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Christopher Oil & Gas Inc |
| Production reports | Christopher Oil & Gas Incthrough May 2004 |
| Latest permit | Christopher Oil & Gas IncDec 9, 1993 |
- 10,500
- total depth, ft
- 2
- permits on file
- Dec 9, 1993
- last permit issued
- Nov 18, 1991
- completed
- 0
- cumulative oil, bbl
- 1.15M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 18, 1991
- Shut in
- —
- Plugged
- Dec 9, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Langston-Elliot G-2-148212 | Terryville, SW. (9600) | Christopher Oil & Gas Inc | 1 | 0 | 1.11M | Dec 1993 – Dec 2005 |
| Langston-Eliot G-2-140590 | Terryville, SW. (9920) | Christopher Oil & Gas Inc | 1 | 0 | 43.1K | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Christopher Oil & Gas IncJan 1993 → May 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 418997-99 | Recompletion | Christopher Oil & Gas Inc | Dec 6, 1993 | Dec 9, 1993 | Dec 1, 1993 | 10,500 |
| 386742-99 | Drill | Christopher Oil & Gas Inc | Apr 12, 1991 | Apr 12, 1991 | May 16, 1991 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-140590 | — | — | — | — |
| — | — G-2-148212 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 277 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,630 | 9,646 | Perforated |
| 9,916 | 9,926 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,950 | 12.25 | 775 S |
| 5.5 | 10,500 | 8.75 | 905 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 1997 | Jul 8, 1997 | — |
| 00 | Jun 2, 1994 | Jan 19, 1994 | Yes |
| 00 | Mar 3, 1994 | — | — |
| 00 | May 15, 1992 | Jan 9, 1992 | — |
| 00 | Apr 7, 1992 | Dec 3, 1991 | Yes |
| 00 | Feb 14, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31687 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31687 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331687, documented in the API reference.