WELL · 42-123-31891 · DISTRICT 2
Goebel Dalhardt #1
DE Witt County · Thomaston (Wilcox 8750) field · Vertical
Goebel Dalhardt #1 (API 42-123-31891) is a plugged well in De Witt County, plugged October 17, 2003, last operated by El Paso Production Oil & Gas CO..
The RRC has issued one drilling permit (amended once), issued August 11, 2000, permitted to 18,000 ft.
It was permitted by Coastal Oil & Gas Corporation and has since transferred to El Paso Production Oil & Gas CO. on the wellbore schedule.
Completion filings report 2 formation tops, including Wilcox, Jay Sand.
Operator of record
EL Paso Production Oil & Gas Co.
Permitted by Coastal Oil & Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 30, 2016
- Permits on file
- 616
- Phone
- (713) 420-2600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Paso Production Oil & Gas Co. |
| Production reports | EL Paso Production Oil & Gas Co.through Mar 2002 |
| Latest permit | Coastal Oil & Gas CorporationAug 11, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 18,000
- total depth, ft
- 2
- permits on file
- Aug 11, 2000
- last permit issued
- Mar 1, 2001
- completed
- 0
- cumulative oil, bbl
- 125K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Sep 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 1, 2001
- Shut in
- —
- Plugged
- Oct 17, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goebel, Dalhardt G-2-183418 | Thomaston (Wilcox 8750) | EL Paso Production Oil & Gas Co. | 1 | 0 | 125K | Mar 2001 – Sep 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Mar 2001 → Mar 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 498358-98 | Drill | Coastal Oil & Gas Corporation | Jan 22, 2001 | Aug 11, 2000 | — | 18,000 |
| 498358-99 | Drill | Coastal Oil & Gas Corporation | Aug 11, 2000 | Aug 11, 2000 | Oct 16, 2000 | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-183418 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 138 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,803 | 8,810 | Perforated |
| 8,823 | 8,823 | Perforated |
| 14,832 | 14,846 | Perforated |
| 15,426 | 15,506 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,025 | 17.5 | 2,130 S |
| 9.625 | 10,530 | 12.25 | 1,940 S |
| 4.5 | 17,000 | 6.5 | 1,110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2001 | Apr 13, 2001 | Yes |
| 00 | Aug 2, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-31891 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-31891 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12331891, documented in the API reference.