TEXAS · WELLS · DE WITT COUNTY · API 42-123-32225 · DISTRICT 02
Nagel #1
De Witt County · Arneckeville (Yegua 4870) field · Vertical
Nagel #1 (API 42-123-32225) is a plugged well in De Witt County, plugged September 19, 2012, last operated by Strand Energy L.C..
The RRC has issued 2 drilling permits between 2008 and 2009, permitted to 5,700 ft.
Completion filings report one formation top, including T/Yegua.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 30, 2026
- Permits on file
- 321
- Phone
- (713) 658-8096
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Strand Energy L.C. |
| Production reports | Strand Energy, L.C.through Jul 2012 |
| Latest permit | Strand Energy, L.C.Apr 20, 2009 |
- 5,700
- total depth, ft
- 2
- permits on file
- Apr 20, 2009
- last permit issued
- Apr 15, 2009
- completed
- 0
- cumulative oil, bbl
- 148K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Mar 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 15, 2009
- Shut in
- —
- Plugged
- Sep 19, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nagel G-2-249239 | Arneckeville (Yegua 4870) | Strand Energy, L.C. | 1 | 0 | 143K | Apr 2009 – Mar 2013 |
| Nagel G-2-244758 | Arneckeville (Yegua 5260) | Strand Energy, L.C. | 1 | 0 | 4.49K | Dec 2008 – Sep 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Strand Energy, L.C.Dec 2008 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 680495-99 | Recompletion | Strand Energy, L.C. | Apr 17, 2009 | Apr 20, 2009 | Apr 14, 2009 | 5,304 |
| 663469-99 | Drill | Strand Energy, L.C. | Jun 2, 2008 | Jun 18, 2008 | Jul 25, 2008 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 15, 2009 | Nagel G-2-249239 | Arneckeville (Yegua 4870) | Strand Energy L.C. | Plugged | — |
| Dec 24, 2008 | Nagel G-2-244758 | Arneckeville (Yegua 5260) | Strand Energy L.C. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 190 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Yegua | 4,745 | -4,555 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,819 | 4,827 | Perforated |
| 4,843 | 4,845 | Perforated |
| 5,281 | 5,286 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,734 | 12.25 | 600 S |
| 4.5 | 5,455 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 21, 2009 | Apr 29, 2009 | Yes |
| 00 | Jul 15, 2009 | — | — |
| 00 | Mar 7, 2009 | Jan 8, 2009 | Yes |
| 00 | Feb 7, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-32225 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-32225 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12332225, documented in the API reference.