TEXAS · WELLS · DE WITT COUNTY · API 42-123-32336 · DISTRICT 02

Muir B #1H

Y

De Witt County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

Muir B #1H (API 42-123-32336) is a horizontal well in De Witt County operated by Devon Energy Production CO L.P., completed July 12, 2011 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2010 and 2012, permitted to 13,111 ft.

It was permitted by Geosouthern Energy Corporation and has since transferred to Devon Energy Production CO L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 610K barrels of oil and 2.95M mcf of gas since December 2010, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Devon Energy Production Co L.P.

Permitted by Geosouthern Energy Corporation; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 18, 2025
Permits on file
9,266
Phone
(405) 235-3611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDevon Energy Production Co L.P.
Production reportsDevon Energy Production Co, L.P.through Apr 2026
Latest permitGeosouthern Energy CorporationAug 22, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,111
total depth, ft
2
permits on file
Aug 22, 2012
last permit issued
Jul 12, 2011
completed
610K
cumulative oil, bbl
2.95M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Muir B O-2-10620Eagleville (Eagle Ford-2)Devon Energy Production Co, L.P.3610K2.19MFeb 2013 – Jul 2026
Muir B G-2-259941Eagleville (Eagle Ford-2)Devon Energy Production Co, L.P.10763KDec 2010 – Jul 2015

Oil, barrels lease total

Last 12 months 1,633 · prior 12 3,695(-56%)

05001K202420252026

Gas, mcf lease total

Last 12 months 3,653 · prior 12 6,671(-45%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geosouthern Energy CorporationJun 2011 → Feb 2014
  2. 2Devon Energy Production Co, L.P.Mar 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744412-99Field transferGeosouthern Energy CorporationJul 11, 2012Aug 22, 2012Jul 21, 201014,000
697918-99DrillPetrohawk Operating CompanyJun 22, 2010Jun 23, 2010Jul 21, 201014,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 12, 2011Muir B O-2-10620Eagleville (Eagle Ford-2)Devon Energy Production Co L.P.Producing13,111
Jul 12, 2011Muir B G-2-259941Eagleville (Eagle Ford-2)Devon Energy Production Co L.P.Not on Schedule—
Jul 12, 2011Muir B G-2-259941Eagleville (Eagle Ford-2)Devon Energy Production Co L.P.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 317 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap11,981-11,664
Austin Chalk12,208-11,891
Eagle Ford12,756-12,439
Eagle FordEAGLEFORD12,756-12,439

Perforations

Perforated and open-hole intervals.

FromToType
12,89119,175Perforated
12,89119,547Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,52714.751,460 S
5.512,0566.753,730 S
5.513,1116.753,730 S
4.519,6206.753,730 S
4.520,1226.753,730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 8, 2015Jan 8, 2015Yes
00Nov 12, 2014Aug 20, 2014—
00Oct 5, 2012Mar 8, 2012—
00Aug 6, 2012Aug 24, 2011Yes
00Jun 8, 2011Dec 10, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12332336, documented in the API reference.