TEXAS · WELLS · DE WITT COUNTY · BISHOP A LEASE · API 42-123-32749 · DISTRICT 02
Bishop A #2H
De Witt County · Eagleville (Eagle Ford-2) field · Shut In · Horizontal
Bishop A #2H (API 42-123-32749) is a horizontal well in De Witt County operated by Devon Energy Production CO L.P., completed June 5, 2024 and listed as shut in on the RRC schedule, shut in June 1, 2025.
The RRC has issued one drilling permit, issued May 16, 2012, permitted to 12,585 ft.
It was permitted by Geosouthern Energy Corporation and has since transferred to Devon Energy Production CO L.P. on the wellbore schedule.
Completion filings report 8 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Catahoula.
Its lease has reported 4.73M barrels of oil and 11.4M mcf of gas since February 2011, last reporting volume in April 2026. The lease carries 14 wells, so these are lease totals, not this well alone.
Operator of record
Devon Energy Production Co L.P.
Permitted by Geosouthern Energy Corporation; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Dec 18, 2025
- Permits on file
- 9,266
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Devon Energy Production Co L.P. |
| Production reports | Devon Energy Production Co, L.P.through Apr 2026 |
| Latest permit | Geosouthern Energy CorporationMay 16, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,585
- total depth, ft
- 1
- permits on file
- May 16, 2012
- last permit issued
- Jun 5, 2024
- completed
- 4.73M
- cumulative oil, bbl
- 11.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 5, 2024
- Shut in
- Jun 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bishop A O-2-9953 | Eagleville (Eagle Ford-2) | Devon Energy Production Co, L.P. | 14 | 4.73M | 11.4M | Feb 2011 – Apr 2026 |
Oil, barrels lease total
Last 12 months 84,287 · prior 12 132,920(-37%)
Gas, mcf lease total
Last 12 months 214,218 · prior 12 311,491(-31%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geosouthern Energy CorporationFeb 2011 → Feb 2014
- 2Devon Energy Production Co, L.P.Mar 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 737017-99 | Drill | Geosouthern Energy Corporation | Mar 27, 2012 | May 16, 2012 | May 29, 2012 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 5, 2024 | Bishop A O-2-9953 | Eagleville (Eagle Ford-2) | Devon Energy Production Co L.P. | Shut In · shut in Jun 1, 2025 | 12,585 |
Formation tops
As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 11,509 | -11,299 |
| Austin Chalk | 11,699 | -11,489 |
| Eagle Ford | 12,237 | -12,027 |
| Eagle FordEAGLEFORD | 12,237 | -12,027 |
| Austin Chalk | — | — |
| Catahoula | — | — |
| Eagle Ford | — | — |
| Frio | — | — |
| Vicksburg | — | — |
| Wilcox | — | — |
| Yegua | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,428 | 16,488 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,523 | 12.25 | 1,060 S |
| 9.625 | 2,553 | 12.25 | 1,060 S |
| 5.5 | 11,206 | 6.75 | 2,115 S |
| 4.5 | 16,594 | 6.75 | 2,115 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 19, 2026 | Feb 9, 2026 | — |
| 00 | Aug 25, 2014 | Jun 11, 2014 | — |
| 00 | Apr 2, 2013 | Jan 9, 2013 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Jun 1, 2015. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Pecan Gap | TIFF | 7,367 to 11,644 | Jun 1, 2015run Jun 9, 2012 | 3.68 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-123-32749 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-123-32749 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12332749, documented in the API reference.