WELL · 42-123-33030 · DISTRICT 2

A.J. Baker A #3H

Y

DE Witt County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

A.J. Baker A #3H (API 42-123-33030) is a horizontal well in De Witt County operated by Bpx Operating Company, completed June 12, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 25, 2013, permitted to 14,000 ft.

It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Pecan Gap, Austin Chalk, Eagle Ford.

Its lease has reported 2.27M barrels of oil and 3.88M mcf of gas since April 2012, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

BPX Operating Company

Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Apr 2026
Latest permitPetrohawk Operating CompanyJan 25, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Jan 25, 2013
last permit issued
Jun 12, 2013
completed
2.27M
cumulative oil, bbl
3.88M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 12, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
A.J. Baker A O-2-10169Eagleville (Eagle Ford-2)BPX Operating Company52.27M3.88MApr 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 66,983 · prior 12 28,940(+131%)

020K40K60K202420252026

Gas, mcf lease total

Last 12 months 90,694 · prior 12 54,124(+68%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geosouthern Energy CorporationApr 2012 → Feb 2014
  2. 2Devon Energy Production Co, L.P.Mar 2014 → Jun 2025
  3. 3BPX Operating CompanyJul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
755188-99DrillPetrohawk Operating CompanyJan 21, 2013Jan 25, 2013Feb 7, 201314,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-10169————

Formation tops

As filed on W-2/G-1. Subsea from 368 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho11,952-11,584
Pecan Gap12,044-11,676
Austin Chalk12,127-11,759
Austin Chalk12,202-11,834
Eagle Ford12,589-12,221
Eagle FordEAGLE FORD SHALE12,589-12,221
Eagle Ford12,590-12,222

Perforations

Perforated and open-hole intervals.

FromToType
13,05719,103Perforated
13,25419,103Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,48317.51,050 S
9.6259,52112.251,085 S
5.519,2088.52,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2026Sep 16, 2026—
00Aug 10, 2016Aug 10, 2016—
00Jun 25, 2014Apr 29, 2014Yes
00Mar 10, 2014Feb 4, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12333030, documented in the API reference.