TEXAS · WELLS · DE WITT COUNTY · NATHO B LEASE · API 42-123-33635 · DISTRICT 02

Natho B #2H

Y

De Witt County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

Natho B #2H (API 42-123-33635) is a horizontal well in De Witt County operated by Bpx Operating Company, completed February 28, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 24, 2014, permitted to 13,397 ft.

It was permitted by Bhp Billiton Pet(Txla OP) CO and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 8 formation tops, including Catahoula, Frio, Vicksburg, Yegua.

Its lease has reported 281K barrels of oil and 3.38M mcf of gas since June 2013, last reporting volume in March 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

BPX Operating Company

Permitted by BHP Billiton Pet(txla OP) Co; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Mar 2026
Latest permitBHP Billiton Pet(txla OP) CoJun 24, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,397
total depth, ft
1
permits on file
Jun 24, 2014
last permit issued
Feb 28, 2015
completed
281K
cumulative oil, bbl
3.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 28, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Natho B O-2-10729Eagleville (Eagle Ford-2)BPX Operating Company7281K3.38MJun 2013 – Mar 2026

Gas, mcf lease total

Last 12 months 42,037 · prior 12 94,449(-55%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 3,843 · prior 12 6,077(-37%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Devon Energy Production Co, L.P.Feb 2015 → Jun 2025
  2. 2BPX Operating CompanyJul 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
787450-99DrillBHP Billiton Pet(txla OP) CoMay 20, 2014Jun 24, 2014Aug 5, 201414,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 28, 2015Natho B O-2-10729Eagleville (Eagle Ford-2)BPX Operating CompanyProducing13,397

Formation tops

As filed on W-2/G-1. Subsea from 230 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula1,450-1,220
Frio2,460-2,230
Vicksburg3,440-3,210
Yegua4,660-4,430
Wilcox6,540-6,310
Austin Chalk12,828-12,598
Austin Chalk12,831-12,601
Eagle Ford13,302-13,072
EdwardsEDWARDS - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
13,56719,340Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,55617.5915 S
9.62510,46712.25798 S
5.519,4827.8751,435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 17, 2015May 29, 2015—
00Nov 4, 2015Feb 3, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12333635, documented in the API reference.