WELL · 42-123-33790 · DISTRICT 2

Lanik B #6H

Y

DE Witt County · Eagleville (Eagle Ford-2) field · Shut IN  · Horizontal

Lanik B #6H (API 42-123-33790) is a horizontal well in De Witt County operated by Bpx Operating Company, completed February 7, 2015 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued September 19, 2014, permitted to 14,000 ft.

It was permitted by Bhp Billiton Pet(Txla OP) CO and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 10 formation tops, including Frio, Vicksburg, Yegua, Cook Mountain.

Its lease has reported 2.73M barrels of oil and 8.44M mcf of gas since March 2013, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

BPX Operating Company

Permitted by BHP Billiton Pet(txla OP) Co; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Apr 2026
Latest permitBHP Billiton Pet(txla OP) CoSep 19, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Sep 19, 2014
last permit issued
Feb 7, 2015
completed
2.73M
cumulative oil, bbl
8.44M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 7, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lanik B O-2-10560Eagleville (Eagle Ford-2)BPX Operating Company112.73M8.44MMar 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 61,481 · prior 12 69,635(-12%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 190,769 · prior 12 229,788(-17%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geosouthern Energy CorporationJun 2013 → Feb 2014
  2. 2Devon Energy Production Co, L.P.Mar 2014 → Jun 2025
  3. 3BPX Operating CompanyJul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
794471-99DrillBHP Billiton Pet(txla OP) CoAug 19, 2014Sep 19, 2014Dec 24, 201414,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-10560————

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Frio200178
Vicksburg1,100-722
Yegua2,352-1,974
Cook Mountain3,275-2,897
Sparta3,877-3,499
Wilcox5,314-4,936
Midway9,648-9,270
Navarro10,510-10,132
Anacacho12,584-12,206
Catahoula——

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,96412.251,226 S
5.519,2808.753,211 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 29, 2016Oct 6, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12333790, documented in the API reference.