WELL · 42-125-30792 · DISTRICT 8
Bell #3A
Dickens County · Soldier Mound (Tannehill) field · Vertical
Bell #3A (API 42-125-30792) is a well in Dickens County operated by Schalk Oil Company Inc., completed May 14, 2002.
The RRC has issued 2 drilling permits in 2002, permitted to 5,300 ft.
Completion filings report 3 formation tops, including Dothum, Croton Lime, Tannehill.
Its 2 leases have reported 1.88M barrels of oil and 25.4K mcf of gas since October 2001, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 3, 2026
- Permits on file
- 184
- Phone
- (940) 322-3424
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Schalk Oil Company Inc. |
| Production reports | Schalk Oil Company, Inc.through Apr 2026 |
| Latest permit | Schalk Oil Company, Inc.Sep 16, 2002 |
- 5,300
- total depth, ft
- 2
- permits on file
- Sep 16, 2002
- last permit issued
- May 14, 2002
- completed
- 1.88M
- cumulative oil, bbl
- 25.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 14, 2002
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bell O-11-68356 | Soldier Mound (Tannehill) | Schalk Oil Company, Inc. | 6 | 1.27M | 25.3K | Oct 2001 – Jul 2026 |
| Bell O-11-68379 | Soldier Mound (Stockwether) | Schalk Oil Company, Inc. | 4 | 607K | 42 | Nov 2001 – Jul 2026 |
Oil, barrels lease total
Last 12 months 9,705 · prior 12 13,695(-29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Schalk Oil Company, Inc.Oct 2001 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 523508-99 | Recompletion | Schalk Oil Company, Inc. | Sep 9, 2002 | Sep 16, 2002 | Apr 20, 2002 | 5,300 |
| 519213-99 | Drill | Schalk Oil Company, Inc. | Apr 18, 2002 | Apr 18, 2002 | Apr 20, 2002 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68356 | — | — | — | — |
| — | — O-11-68356 | — | — | — | — |
| — | — O-11-68379 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,301 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothum | 4,510 | -2,209 |
| Croton Lime | 4,860 | -2,559 |
| TannehillLOWER TANNEHILL | 4,900 | -2,599 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,782 | 4,790 | Perforated |
| 4,932 | 4,933 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 270 | 17.5 | 285 S |
| 8.625 | 713 | 12.25 | 265 S |
| 5.5 | 5,052 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 21, 2002 | Aug 5, 2002 | Yes |
| 00 | Sep 20, 2002 | May 31, 2002 | Yes |
| 00 | Sep 19, 2002 | — | — |
| 00 | Jul 12, 2002 | May 31, 2002 | Yes |
| 00 | Jun 13, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-125-30792 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-125-30792 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12530792, documented in the API reference.