TEXAS · WELLS · DICKENS COUNTY · API 42-125-31021 · DISTRICT 7B
Iron Bridge Tannehill a Sand Unt #1901
Dickens County · Iron Bridge (Tannehill a Sand) field · Shut In · Vertical
Iron Bridge Tannehill A Sand Unt #1901 (API 42-125-31021) is a well in Dickens County operated by Canan Mowrey Operating LLC, completed February 15, 2006 and listed as shut in on the RRC schedule, shut in July 1, 2024.
The RRC has issued one drilling permit (amended once), issued December 27, 2005, permitted to 4,720 ft.
It was permitted by Sullivan, Hollis R. Inc. and has since transferred to Canan Mowrey Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including T/Dothan, T/Stockwether, T/Croton.
Its 2 leases have reported 204K barrels of oil and 21.8K mcf of gas since February 2006, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Sullivan, Hollis R. Inc.; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 14, 2025
- Permits on file
- 118
- Phone
- (940) 687-2214
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Canan Mowrey Operating LLC |
| Production reports | Canan Mowrey Operating, LLCthrough Apr 2026 |
| Latest permit | Sullivan, Hollis R. Inc.Dec 27, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,720
- total depth, ft
- 2
- permits on file
- Dec 27, 2005
- last permit issued
- Feb 15, 2006
- completed
- 204K
- cumulative oil, bbl
- 21.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 15, 2006
- Shut in
- Jul 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Iron Bridge Tannehill a Sand Unt O-11-70886 | Iron Bridge (Tannehill a Sand) | Canan Mowrey Operating, LLC | 7 | 155K | 14.4K | Mar 2019 – Jul 2026 |
| Key Unit O-11-68892 | Iron Bridge (Tannehill a Sand) | Canan Mowrey Operating, LLC | 1 | 48.7K | 7.33K | Feb 2006 – Oct 2019 |
Oil, barrels lease total
Last 12 months 11,068 · prior 12 20,874(-47%)
Gas, mcf lease total
Last 12 months 2,551 · prior 12 2,337(+9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sullivan, Hollis R. Inc.Feb 2006 → Dec 2008
- 2Canan Mowrey Operating, LLCJan 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 611584-98 | Drill | Sullivan, Hollis R. Inc. | Jan 3, 2006 | Dec 27, 2005 | Jan 31, 2006 | 7,200 |
| 611584-99 | Drill | Sullivan, Hollis R. Inc. | Dec 27, 2005 | Dec 27, 2005 | Jan 31, 2006 | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 15, 2006 | Iron Bridge Tannehill a Sand Unt O-11-70886 | Iron Bridge (Tannehill a Sand) | Canan Mowrey Operating LLC | Shut In · shut in Jul 1, 2024 | 4,720 |
| Feb 15, 2006 | Key Unit O-11-68892 | Iron Bridge (Tannehill a Sand) | Canan Mowrey Operating LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,208 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Dothan | 4,330 | -2,122 |
| T/Stockwether | 4,482 | -2,274 |
| T/Croton | 4,655 | -2,447 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,637 | 4,642 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 252 | 17.5 | 200 S |
| 8.625 | 1,416 | 11 | 125 S |
| 5.5 | 4,719 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 20, 2019 | Mar 2, 2006 | Yes |
| 00 | Jun 23, 2006 | Mar 2, 2006 | Yes |
| 00 | Mar 14, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-125-31021 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-125-31021 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12531021, documented in the API reference.