TEXAS · WELLS · DIMMIT COUNTY · DIMMIT-WOOD UNIT LEASE · API 42-127-33265 · DISTRICT 01

Dimmit-Wood Unit #2H

Plugged

Dimmit County · Pearsall (Austin Chalk) field  · Horizontal

Dimmit-Wood Unit #2H (API 42-127-33265) is a plugged horizontal well in Dimmit County, plugged October 25, 2020, last operated by Exco Operating Company LP.

The RRC has issued 2 drilling permits (amended once) between 2005 and 2008, permitted to 6,800 ft.

It was permitted by Sage Energy Company and has since transferred to Exco Operating Company LP on the wellbore schedule.

Its lease has reported 166K barrels of oil and 136K mcf of gas since April 2005, with no volume in the three years through April 2026.

Operator of record

Exco Operating Company LP

Permitted by Sage Energy Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsExco Operating Company, LPthrough Jul 2014
Latest permitSage Energy CompanySep 29, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
3
permits on file
Sep 29, 2008
last permit issued
Apr 24, 2005
completed
166K
cumulative oil, bbl
136K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jul 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 24, 2005
Shut in
—
Plugged
Oct 25, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dimmit-Wood Unit O-1-14596Pearsall (Austin Chalk)Exco Operating Company, LP1166K136KApr 2005 – Jul 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sage Energy CompanyApr 2005 → Mar 2010
  2. 2Chesapeake Operating, Inc.Apr 2010 → Jun 2013
  3. 3Exco Operating Company, LPJul 2013 → Jul 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
668141-99RecompletionSage Energy CompanyAug 1, 2008Sep 29, 2008—6,800
558813-98DrillSage Energy CompanyMay 9, 2005Mar 11, 2005Mar 18, 20056,500
558813-99DrillSage Energy CompanyMar 9, 2005Mar 11, 2005Mar 18, 20056,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 24, 2005Dimmit-Wood Unit O-1-14596Pearsall (Austin Chalk)Exco Operating Company LPPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,1166,320Perforated
6,1166,413Perforated
6,1166,448Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,55214.751,045 S
76,1169.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 13, 2005May 18, 2005Yes
00Jul 14, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12733265, documented in the API reference.