TEXAS · WELLS · DIMMIT COUNTY · BRAY LEASE · API 42-127-33366 · DISTRICT 01
Bray #1H
Dimmit County · Pearsall (Austin Chalk) field · Shut In · Horizontal
Bray #1H (API 42-127-33366) is a horizontal well in Dimmit County operated by Exco Operating Company LP, completed August 22, 2006 and listed as shut in on the RRC schedule, shut in May 1, 2016.
The RRC has issued one drilling permit (amended twice), issued July 7, 2006, permitted to 5,084 ft.
It was permitted by Sage Energy Company and has since transferred to Exco Operating Company LP on the wellbore schedule.
Completion filings report 3 formation tops, including Austin Chalk, Buda, Georgetown.
Its lease has reported 99.4K barrels of oil and 52.2K mcf of gas since August 2006, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Sage Energy Company; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 22, 2025
- Permits on file
- 515
- Phone
- (214) 368-2084
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exco Operating Company LP |
| Production reports | Exco Operating Company, LPthrough Aug 2019 |
| Latest permit | Sage Energy CompanyJul 7, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,084
- total depth, ft
- 3
- permits on file
- Jul 7, 2006
- last permit issued
- Aug 22, 2006
- completed
- 99.4K
- cumulative oil, bbl
- 52.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Aug 2019
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 22, 2006
- Shut in
- May 1, 2016
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bray O-1-14741 | Pearsall (Austin Chalk) | Exco Operating Company, LP | 2 | 99.4K | 52.2K | Aug 2006 – Aug 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sage Energy CompanyAug 2006 → Mar 2010
- 2Chesapeake Operating, Inc.Apr 2010 → Jun 2013
- 3Exco Operating Company, LPJul 2013 → Aug 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 621909-97 | Drill | Sage Energy Company | Sep 22, 2006 | Jul 7, 2006 | Jul 14, 2006 | 6,591 |
| 621909-98 | Drill | Sage Energy Company | Aug 23, 2006 | Jul 7, 2006 | Jul 14, 2006 | 5,100 |
| 621909-99 | Drill | Sage Energy Company | Jun 30, 2006 | Jul 7, 2006 | Jul 14, 2006 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 22, 2006 | Bray O-1-14741 | Pearsall (Austin Chalk) | Exco Operating Company LP | Shut In · shut in May 1, 2016 | 5,084 |
Formation tops
As filed on W-2/G-1. Subsea from 688 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 4,164 | -3,476 |
| Buda | 5,535 | -4,847 |
| Georgetown | 5,960 | -5,272 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,332 | 6,679 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 710 | 14.75 | 105 S |
| 7 | 5,972 | 9.875 | 1,045 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 2007 | Oct 19, 2006 | Yes |
| 00 | Oct 30, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-127-33366 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-127-33366 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/12733366, documented in the API reference.