WELL · 42-127-33613 · DISTRICT 1

Hatch #1H

N

Dimmit County · Wildcat field  · Horizontal

Hatch #1H (API 42-127-33613) is a horizontal well in Dimmit County operated by Chesapeake Operating Inc., completed June 17, 2009.

The RRC has issued 2 drilling permits (amended twice) between 2009 and 2010, permitted to 11,450 ft.

Completion filings report 3 formation tops, including Austin Chalk, Anacacho, Eagle Ford.

Its 2 leases have reported 2.06M barrels of oil and 9.94M mcf of gas since June 2009, last reporting in July 2026. The leases carry 38 wells, so these are lease totals, not this well alone.

Operator of record

Chesapeake Operating Inc.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsTrinity Operating (Usg), LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Aug 11, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,450
total depth, ft
4
permits on file
Aug 11, 2010
last permit issued
Jun 17, 2009
completed
2.06M
cumulative oil, bbl
9.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 17, 2009
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 38 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hatch Dim O-1-15353Briscoe Ranch (Eagleford)Trinity Operating (Usg), LLC372.06M9.94MMar 2010 – Jul 2026
Hatch O-1-15097WildcatChesapeake Operating, Inc.100Jun 2009 – Sep 2011

Gas, mcf lease total

Last 12 months 240,784 · prior 12 253,054(-5%)

010K20K30K202420252026

Oil, barrels lease total

Last 12 months 30,904 · prior 12 36,075(-14%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2010 → Sep 2013
  2. 2Stonegate Production Company,llcOct 2013 → Apr 2018
  3. 3Crimson Energy Partners IV, LLCMay 2018 → Jan 2023
  4. 4Trinity Operating (Usg), LLCFeb 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
700481-98RecompletionChesapeake Operating, Inc.Sep 14, 2010Aug 11, 2010May 4, 200911,450
700481-99RecompletionChesapeake Operating, Inc.Aug 10, 2010Aug 11, 2010—11,450
679889-98DrillStonegate Production Company,llcApr 29, 2009May 8, 2009May 4, 200911,450
679889-99DrillStonegate Production Company,llcMar 27, 2009Apr 9, 2009May 4, 20098,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-15097————
—— O-1-15353————

Formation tops

As filed on W-2/G-1. Subsea from 581 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,637-6,056
Anacacho7,143-6,562
Eagle Ford7,145-6,564

Perforations

Perforated and open-hole intervals.

FromToType
7,61611,310Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,54912.25970 S
77,5158.75332 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 1, 2011Apr 1, 2010Yes
00Jan 29, 2010Sep 3, 2009Yes
00Nov 20, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12733613, documented in the API reference.