TEXAS · WELLS · DIMMIT COUNTY · PISTOL UNIT LEASE · API 42-127-33808 · DISTRICT 01

Pistol Unit #1H

Plugged

Dimmit County · Briscoe Ranch (Eagleford) field  · Horizontal

Pistol Unit #1H (API 42-127-33808) is a plugged horizontal well in Dimmit County, plugged September 23, 2022, last operated by Exco Operating Company LP.

The RRC has issued one drilling permit (amended once), issued November 8, 2010, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Exco Operating Company LP on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Ausitn Chalk, Austin Chalk, Eagle Ford.

Its lease has reported 14.9K barrels of oil and 150K mcf of gas since December 2010, with no volume in the three years through April 2026.

Operator of record

Exco Operating Company LP

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsExco Operating Company, LPthrough Apr 2016
Latest permitChesapeake Operating, Inc.Nov 8, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Nov 8, 2010
last permit issued
Dec 14, 2010
completed
14.9K
cumulative oil, bbl
150K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Apr 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 14, 2010
Shut in
—
Plugged
Sep 23, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pistol Unit O-1-15330Briscoe Ranch (Eagleford)Exco Operating Company, LP114.9K150KDec 2010 – Apr 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jul 2011 → Jun 2013
  2. 2Exco Operating Company, LPJul 2013 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
704856-98DrillChesapeake Operating, Inc.Nov 10, 2010Nov 8, 2010Nov 26, 20109,000
704856-99DrillChesapeake Operating, Inc.Nov 4, 2010Nov 8, 2010Nov 26, 20109,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 14, 2010Pistol Unit O-1-15330Briscoe Ranch (Eagleford)Exco Operating Company LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 557 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho4,924-4,367
Ausitn Chalk5,293-4,736
Austin Chalk5,293-4,736
Eagle Ford6,016-5,459

Perforations

Perforated and open-hole intervals.

FromToType
6,73112,528Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,75012.25536 S
5.512,6268.752,905 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 29, 2011Aug 31, 2011—
00Jul 18, 2011Apr 7, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12733808, documented in the API reference.