TEXAS · WELLS · DIMMIT COUNTY · GONZALEZ UNIT A DIM LEASE · API 42-127-34160 · DISTRICT 01

Gonzalez Unit a Dim #1H

Plugged

Dimmit County · Briscoe Ranch (Eagleford) field  · Horizontal

Gonzalez Unit A Dim #1H (API 42-127-34160) is a plugged horizontal well in Dimmit County, plugged November 28, 2023, last operated by Exco Operating Company LP.

The RRC has issued one drilling permit, issued June 20, 2011, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Exco Operating Company LP on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 26K barrels of oil and 238K mcf of gas since August 2011, with no volume in the three years through April 2026.

Operator of record

Exco Operating Company LP

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsExco Operating Company, LPthrough Aug 2019
Latest permitChesapeake Operating, Inc.Jun 20, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Jun 20, 2011
last permit issued
Dec 2, 2011
completed
26K
cumulative oil, bbl
238K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Aug 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 2, 2011
Shut in
—
Plugged
Nov 28, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gonzalez Unit a Dim O-1-15689Briscoe Ranch (Eagleford)Exco Operating Company, LP126K238KAug 2011 – Aug 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2012 → Jun 2013
  2. 2Exco Operating Company, LPJul 2013 → May 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
718554-99DrillChesapeake Operating, Inc.Jun 16, 2011Jun 20, 2011Aug 7, 20119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 2, 2011Gonzalez Unit a Dim O-1-15689Briscoe Ranch (Eagleford)Exco Operating Company LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 620 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho4,938-4,318
Austin Chalk5,241-4,621
Eagle Ford5,901-5,281

Perforations

Perforated and open-hole intervals.

FromToType
6,40312,535Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,69313.5660 S
5.512,6398.753,105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 6, 2012Jul 18, 2012—
00Apr 18, 2012Jan 16, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12734160, documented in the API reference.