TEXAS · WELLS · DIMMIT COUNTY · VOTAW DIM LEASE · API 42-127-34469 · DISTRICT 01

Votaw Dim #E 1H

Shut in

Dimmit County · Briscoe Ranch (Eagleford) field · Shut In  · Horizontal

Votaw Dim #E 1H (API 42-127-34469) is a horizontal well in Dimmit County operated by Formentera Operations LLC, completed May 30, 2012 and listed as shut in on the RRC schedule, shut in April 1, 2020.

The RRC has issued one drilling permit, issued December 30, 2011, permitted to 6,418 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 55.9K barrels of oil and 225K mcf of gas since April 2012, with no volume in the three years through April 2026.

Operator of record

Formentera Operations LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 11, 2026
Permits on file
93
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsFormentera Operations LLCthrough May 2020
Latest permitChesapeake Operating, Inc.Dec 30, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,418
total depth, ft
1
permits on file
Dec 30, 2011
last permit issued
May 30, 2012
completed
55.9K
cumulative oil, bbl
225K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH May 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 30, 2012
Shut in
Apr 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Votaw Dim O-1-15975Briscoe Ranch (Eagleford)Formentera Operations LLC155.9K225KApr 2012 – May 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jul 2012 → Jun 2013
  2. 2Buffco Production Inc.Sep 2013 → Apr 2016
  3. 3SN Operating, LLCMay 2016 → Jan 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
730649-99DrillChesapeake Operating, Inc.Dec 27, 2011Dec 30, 2011Mar 27, 20129,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 30, 2012Votaw Dim O-1-15975Briscoe Ranch (Eagleford)Formentera Operations LLCShut In · shut in Apr 1, 20206,418

Formation tops

As filed on W-2/G-1. Subsea from 503 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho5,327-4,824
Austin Chalk5,661-5,158
Eagle Ford6,199-5,696
Eagle FordEAGLEFORD6,199-5,696

Perforations

Perforated and open-hole intervals.

FromToType
6,68811,449Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,02212.25706 S
9.6252,20212.25706 S
5.511,5568.752,096 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 2, 2018Feb 1, 2018—
00Nov 8, 2012Sep 19, 2012—
00Sep 10, 2012Jul 18, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12734469, documented in the API reference.