TEXAS · WELLS · DIMMIT COUNTY · HANING UNIT B DIM LEASE · API 42-127-34742 · DISTRICT 01

Haning Unit B Dim #1H

Plugged

Dimmit County · Briscoe Ranch (Eagleford) field  · Horizontal

Haning Unit B Dim #1H (API 42-127-34742) is a plugged horizontal well in Dimmit County, plugged June 19, 2024, last operated by Ineos USA Oil & Gas LLC.

The RRC has issued one drilling permit, issued May 1, 2012, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 122K barrels of oil and 205K mcf of gas since January 2013, last reporting volume in December 2025.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
May 26, 2026
Permits on file
98
Phone
(720) 764-3473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIneos USA Oil & Gas LLC
Production reportsIneos USA Oil & Gas LLCthrough Dec 2025
Latest permitChesapeake Operating, Inc.May 1, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
May 1, 2012
last permit issued
Jan 10, 2013
completed
122K
cumulative oil, bbl
205K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Dec 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 10, 2013
Shut in
—
Plugged
Jun 19, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haning Unit B Dim O-1-16898Briscoe Ranch (Eagleford)Ineos USA Oil & Gas LLC1122K205KJan 2013 – Dec 2025

Oil, barrels lease total

Last 12 months 3 · prior 12 0

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Apr 2021
  3. 3Ineos USA Oil & Gas LLCJul 2025 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
738578-99DrillChesapeake Operating, Inc.Apr 18, 2012May 1, 2012May 28, 20129,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 10, 2013Haning Unit B Dim O-1-16898Briscoe Ranch (Eagleford)Ineos USA Oil & Gas LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 621 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho5,983-5,362
Austin Chalk6,248-5,627
Eagle Ford6,777-6,156

Perforations

Perforated and open-hole intervals.

FromToType
7,25811,623Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,52912.25413 S
5.511,7328.752,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 9, 2013May 20, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12734742, documented in the API reference.