TEXAS · WELLS · DIMMIT COUNTY · HATCH DIM LEASE · API 42-127-35739 · DISTRICT 01

Hatch Dim #C 5H

Shut in

Dimmit County · Briscoe Ranch (Eagleford) field · Water Supply  · Horizontal

Hatch Dim #C 5H (API 42-127-35739) is a horizontal well in Dimmit County operated by Trinity Operating (Usg) LLC, completed August 18, 2013 and listed as water supply on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit, issued August 15, 2013, permitted to 2,429 ft.

It was permitted by Stonegate Production Company,LLC and has since transferred to Trinity Operating (Usg) LLC on the wellbore schedule.

Its lease has reported 2.06M barrels of oil and 9.94M mcf of gas since March 2010, last reporting volume in April 2026. The lease carries 37 wells, so these are lease totals, not this well alone.

Operator of record

Trinity Operating (Usg) LLC

Permitted by Stonegate Production Company,llc; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
392
Phone
(713) 951-5309

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrinity Operating (Usg) LLC
Production reportsTrinity Operating (Usg), LLCthrough Apr 2026
Latest permitStonegate Production Company,llcAug 15, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,429
total depth, ft
1
permits on file
Aug 15, 2013
last permit issued
Aug 18, 2013
completed
2.06M
cumulative oil, bbl
9.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 18, 2013
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 37 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hatch Dim O-1-15353Briscoe Ranch (Eagleford)Trinity Operating (Usg), LLC372.06M9.94MMar 2010 – Apr 2026

Gas, mcf lease total

Last 12 months 240,784 · prior 12 253,054(-5%)

010K20K30K202420252026

Oil, barrels lease total

Last 12 months 30,904 · prior 12 36,075(-14%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2010 → Sep 2013
  2. 2Stonegate Production Company,llcOct 2013 → Apr 2018
  3. 3Crimson Energy Partners IV, LLCMay 2018 → Jan 2023
  4. 4Trinity Operating (Usg), LLCFeb 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
768134-99DrillStonegate Production Company,llcAug 13, 2013Aug 15, 2013Aug 17, 20139,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 18, 2013Hatch Dim O-1-15353Briscoe Ranch (Eagleford)Trinity Operating (Usg) LLCWater Supply · shut in Jul 1, 20262,429

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,42912.25745 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 7, 2023Nov 7, 2023—
00Jan 21, 2016Nov 30, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/12735739, documented in the API reference.