WELL · 42-131-05961 · DISTRICT 4
White Paul E. B #19
Duval County · Lundell (Cole) field · Vertical
White Paul E. B #19 (API 42-131-05961) is a plugged well in Duval County, plugged November 15, 1988, last operated by Exxon Corp..
The RRC has issued 4 drilling permits between 1983 and 1988, permitted to 2,558 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Exxon Corp.Jul 25, 1988 |
- 2,558
- total depth, ft
- 4
- permits on file
- Jul 25, 1988
- last permit issued
- Apr 9, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 9, 1984
- Shut in
- —
- Plugged
- Nov 15, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 349132-99 | Recompletion | Exxon Corp. | Jul 20, 1988 | Jul 25, 1988 | — | 2,558 |
| 270002-99 | Recompletion | Exxon Corp. | Mar 18, 1985 | Mar 19, 1985 | — | 2,558 |
| 234482-99 | Recompletion | Exxon Corp. | Feb 9, 1984 | Mar 27, 1984 | — | 2,558 |
| 196261-99 | Recompletion | Exxon Corp. | May 25, 1983 | May 25, 1983 | — | 2,558 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 9, 1984 | White Paul E. B G-4-110358 | Lundell (Cole) | Exxon Corp. | Plugged | — |
| Jul 14, 1983 | White P. E. -B- O-4-1700 | Lundell (Pettus) | Killam Oil Co. Ltd. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,532 | 1,537 | Perforated |
| 2,396 | 2,403 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 203 | — | — |
| 2 | 2,522 | — | — |
| 5.5 | 2,548 | — | — |
| 5.5 | 2,549 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 1985 | Jan 9, 1985 | — |
| 00 | Jun 4, 1984 | May 4, 1984 | — |
| 00 | Jun 4, 1984 | Aug 17, 1983 | — |
| 00 | May 15, 1984 | May 4, 1984 | — |
| 00 | Jan 12, 1984 | Aug 17, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-05961 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-05961 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000067293 | W-14 Disposal | Plugged Dec 8, 1988 | 5,000 | 800 | 1,647–1,687 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13105961, documented in the API reference.