WELL · 42-131-05979 · DISTRICT 4
White P. E. -B- #58
Duval County · Lundell (Pettus) field · Vertical
White P. E. -B- #58 (API 42-131-05979) is a permitted well in Duval County filed by Killam Oil CO., Ltd.; no completion report is on file yet.
The RRC has issued one drilling permit, issued February 3, 2015, permitted to 2,375 ft.
Completion filings report 3 formation tops, including Jackson, Yegua, Catahoula.
Its 2 leases have reported 258K barrels of oil and 29.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Laredo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 9, 2026
- Permits on file
- 837
- Phone
- (956) 724-7141
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Killam Oil Co. Ltd. |
| Production reports | Killam Oil Co., Ltd.through Apr 2026 |
| Latest permit | Killam Oil Co., Ltd.Feb 3, 2015 |
- 2,375
- total depth, ft
- 1
- permits on file
- Feb 3, 2015
- last permit issued
- —
- completed
- 258K
- cumulative oil, bbl
- 29.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| P. E. White 'B' G-4-277418 | Lundell (Mirando No. 1) | Killam Oil Co., Ltd. | 1 | 0 | 9.07K | Jul 2013 – Jul 2026 |
| White, P. E. -B- O-4-5627 | Lundell (Mirando No. 2) | Killam Oil Co., Ltd. | 6 | 258K | 20.8K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 5,421 · prior 12 6,492(-16%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Dec 1995
- 2Killam Oil Co., Ltd.Jan 1996 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 803182-99 | Recompletion | Killam Oil Co., Ltd. | Jan 23, 2015 | Feb 3, 2015 | Jul 1, 2011 | 2,375 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-277418 | — | — | — | — |
| — | — O-4-5627 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 655 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,588 | 1,594 | Perforated |
| 1,598 | 1,603 | Perforated |
| 2,350 | 2,355 | Perforated |
| — | 2,381 | Perforated |
| — | 2,527 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 207 | 12.25 | 70 S |
| 5.5 | 2,571 | 7.75 | 135 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 11, 2016 | Jun 30, 2016 | — |
| 00 | Aug 4, 2015 | May 26, 2015 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-05979 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-05979 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13105979, documented in the API reference.