TEXAS · WELLS · DUVAL COUNTY · API 42-131-06015 · DISTRICT 04
White P. E. B #91
Duval County · Lundell (Hockley 1850) field · Vertical
White P. E. B #91 (API 42-131-06015) is a plugged well in Duval County, plugged January 11, 1989, last operated by Exxon Corp..
The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 2,410 ft.
Completion filings report one formation top, including Caliche-Shale.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Jul 30, 1987 |
- 2,410
- total depth, ft
- 2
- permits on file
- Jul 30, 1987
- last permit issued
- Sep 17, 1987
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 17, 1987
- Shut in
- —
- Plugged
- Jan 11, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named White P. E. B
Exxon Corp.'s other wells filed under this lease name in Duval County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 333643-99 | Recompletion | Exxon Corp. | Jul 28, 1987 | Jul 30, 1987 | — | 2,410 |
| 269975-99 | Recompletion | Exxon Corp. | May 20, 1985 | Mar 19, 1985 | — | 2,410 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 17, 1987 | White P. E. B G-4-116666 | Lundell (Hockley 1850) | Exxon Corp. | Plugged | — |
| Sep 17, 1987 | White P. E. B G-4-116666 | Lundell (Hockley 1850) | Exxon Corp. | Plugged | — |
| — | White P. E. -B- O-4-5624 | Lundell (Mirando No. 1) | Killam Oil Co. Ltd. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 584 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caliche-Shale | 1 | 583 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,690 | 1,696 | Perforated |
| 1,762 | 1,768 | Perforated |
| — | 2,296 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 381 | 9.875 | 110 S |
| 7 | 381 | — | — |
| 7 | 393 | 9.875 | 110 S |
| 2.875 | 2,386 | 6.125 | 200 S |
| 2.875 | 2,777 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 10, 1987 | Oct 7, 1987 | Yes |
| 00 | Jun 19, 1985 | May 17, 1985 | — |
| 00 | Jun 7, 1985 | — | — |
| 00 | Jan 12, 1984 | Jul 25, 1962 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-06015 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-06015 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13106015, documented in the API reference.