WELLS · 42-131-08516 · TEXAS · 04 DISTRICT

Tinney W. A. Est. #1A

Shut inOil well

Operator
Chapco Inc.
County
Duval

An oil well in Duval County, Texas, operated by Chapco Inc. RRC status: shut in.

Completed in one field: Piedras Pintas Dome.

Completions

ONE PER FIELD THE WELL IS COMPLETED IN

FieldStatusPerforations, ftCompleted
Piedras Pintas DomeShut in——

Well record

API number
42-131-08516
Property
Tinney W. A. Est.

The Railroad Commission's wellbore schedule lists this well, but no drilling permit is on file for it here, so its permits, completion reports, and formation tops are not shown. Texas reports production by lease, not by well: search the leases →

About this data

Railroad Commission of Texas (RRC): the wellbore schedule, which lists every well the Commission tracks with its operator, field, status, and dates. No drilling permit is on file for this API number, so nothing from the permit record is shown. Texas reports production by lease, not by well. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/4213108516, documented in the API reference.