TEXAS · WELLS · DUVAL COUNTY · API 42-131-10808 · DISTRICT 04

White P. E. -B- #97

Plugged

Duval County · Lundell (Mirando No. 2) field  · Vertical

White P. E. -B- #97 (API 42-131-10808) is a plugged well in Duval County, plugged June 8, 2007, last operated by Killam Oil CO. Ltd..

The RRC has issued one drilling permit, issued November 6, 1981, permitted to 5,715 ft.

It was permitted by Exxon Corp. and has since transferred to Killam Oil CO. Ltd. on the wellbore schedule.

Its 2 leases have reported 35.2K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Killam Oil Co. Ltd.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Jun 2003
Latest permitExxon Corp.Nov 6, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,715
total depth, ft
1
permits on file
Nov 6, 1981
last permit issued
Dec 11, 1981
completed
0
cumulative oil, bbl
35.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 11, 1981
Shut in
—
Plugged
Jun 8, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
White, Paul E. -B- G-4-37636Lundell (Queen City #3)Killam Oil Co., Ltd.1035.2KJan 1993 – Jun 2003
White, P. E. -B- G-4-65635Lundell (Queen City #1)Killam Oil Co., Ltd.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Dec 1995
  2. 2Killam Oil Co., Ltd.Jan 1996 → Jun 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
139762-99RecompletionExxon Corp.Nov 6, 1981Nov 6, 1981—5,715

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 11, 1981White P. E. -B- O-4-5627Lundell (Mirando No. 2)Killam Oil Co. Ltd.Plugged—
Dec 1, 1975White P. E. -B- G-4-65635Lundell (Queen City #1)Killam Oil Co. Ltd.Plugged—
Dec 13, 1965White Paul E. -B- G-4-37636Lundell (Queen City #3)Killam Oil Co. Ltd.Plugged—
Dec 1, 1965White P. E. -B- G-4-37631Lundell (Queen City #4)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,3902,396Perforated
5,6195,625Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625479——
2.8755,671——
2.8755,699——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 4, 1982—
00Jan 12, 1984Jan 23, 1976—
00Jan 12, 1984Dec 29, 1965—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13110808, documented in the API reference.