TEXAS · WELLS · DUVAL COUNTY · WERNECKE - WEATHERBY G.U. LEASE · API 42-131-32502 · DISTRICT 04
Wernecke - Weatherby G.U. #1
Duval County · Rosita NW (Wilcox Cons.) field · Vertical
Wernecke - Weatherby G.U. #1 (API 42-131-32502) is a plugged well in Duval County, plugged March 25, 1997, last operated by Shell Western E&P Inc..
The RRC has issued 2 drilling permits between 1978 and 1987, permitted to 15,345 ft.
Completion filings report one formation top, including Wilcox.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 16, 1999
- Permits on file
- 2,528
- Phone
- (281) 544-3215
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Western E&P Inc. |
| Production reports | Shell Western E&P Inc.through Dec 1996 |
| Latest permit | Shell Western E&P Inc.Apr 14, 1987 |
- 15,345
- total depth, ft
- 2
- permits on file
- Apr 14, 1987
- last permit issued
- Jul 18, 1987
- completed
- 0
- cumulative oil, bbl
- 24.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 18, 1987
- Shut in
- —
- Plugged
- Mar 25, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wernecke - Weatherby G.U. G-4-125257 | Rosita, NW (Wilcox R-S-U Cons.) | Shell Western E&P Inc. | 1 | 0 | 24.8K | Jan 1993 – Mar 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Jan 1993 → Dec 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 328869-99 | Recompletion | Shell Western E&P Inc. | Apr 10, 1987 | Apr 14, 1987 | — | 15,345 |
| 16476-99 | Drill | Shell Oil Company | Jan 17, 1978 | Jan 17, 1978 | Feb 5, 1978 | 15,345 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 18, 1987 | Wernecke - Weatherby G.U. G-4-125257 | Rosita NW (Wilcox Cons.) | Shell Western E&P Inc. | Plugged | — |
| Aug 1, 1978 | Wernecke-Weatherby Gas Unit G-4-83095 | Rosita N.W. (Wilcox U) | Shell Western E&P Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 550 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,236 | 12,258 | Perforated |
| 14,052 | 14,140 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,009 | 17.5 | 600 S |
| 9.625 | 8,227 | 12.25 | 1,055 S |
| 9.625 | 8,257 | 12.25 | 1,055 S |
| 2.875 | 13,500 | — | — |
| 5 | 15,327 | 6.75 | 845 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 9, 1994 | Sep 29, 1987 | — |
| 00 | Oct 29, 1987 | Sep 29, 1987 | Yes |
| 00 | Oct 10, 1987 | — | — |
| 00 | Jan 12, 1984 | Jun 4, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-32502 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-32502 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13132502, documented in the API reference.