TEXAS · WELLS · DUVAL COUNTY · HAGIST RANCH 268 LEASE · API 42-131-33908 · DISTRICT 04
Hagist Ranch 268 #1
Duval County · Hagist Ranch ( 750) field · Temp Abandoned · Vertical
Hagist Ranch 268 #1 (API 42-131-33908) is a well in Duval County operated by Hilcorp Energy Company, completed October 2, 1979 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.
The RRC has issued one drilling permit, issued September 10, 1979, permitted to 1,622 ft.
It was permitted by Arco Oil & Gas CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Its lease has reported 3.97K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Jun 1994 |
| Latest permit | Arco Oil & Gas Co.Sep 10, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,622
- total depth, ft
- 1
- permits on file
- Sep 10, 1979
- last permit issued
- Oct 2, 1979
- completed
- 0
- cumulative oil, bbl
- 3.97K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1994
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 2, 1979
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagist Ranch 268 G-4-84899 | Hagist Ranch ( 750) | Hilcorp Energy Company | 1 | 0 | 3.97K | Jan 1993 – Jun 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gillring Oil CompanyJan 1993 → May 1994
- 2Lomak Production CompanyJun 1994 → Jun 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 57909-99 | Drill | Arco Oil & Gas Co. | Sep 10, 1979 | Sep 10, 1979 | — | 1,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 2, 1979 | Hagist Ranch 268 G-4-84899 | Hagist Ranch ( 750) | Hilcorp Energy Company | Temp Abandoned · shut in Jan 1, 1998 | 1,622 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 841 | 862 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 689 | — | — |
| 5.5 | 1,622 | 8.5 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 29, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-33908 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-33908 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13133908, documented in the API reference.