TEXAS · WELLS · DUVAL COUNTY · API 42-131-34744 · DISTRICT 04

Kohler V. -A- #129

Plugged

Duval County · Viggo (Queen City No. 1) field  · Vertical

Kohler V. -A- #129 (API 42-131-34744) is a plugged well in Duval County, plugged May 15, 1989, last operated by KD Energy LLC.

The RRC has issued 2 drilling permits between 1980 and 1982, permitted to 6,000 ft.

It was permitted by Exxon Corp. and has since transferred to KD Energy LLC on the wellbore schedule.

Operator of record

KD Energy LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 12, 2026
Permits on file
72
Phone
(713) 364-7822

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKD Energy LLC
Production reportsnone
Latest permitExxon Corp.Jun 30, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
2
permits on file
Jun 30, 1982
last permit issued
Aug 9, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 9, 1982
Shut in
—
Plugged
May 15, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
165252-99RecompletionExxon Corp.Jun 30, 1982Jun 30, 1982—6,000
79548-99DrillExxon Corp.Apr 23, 1980Apr 23, 1980—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 9, 1982Kohler V. -A- O-4-6096Viggo (Queen City No. 1)KD Energy LLCPlugged—
Aug 9, 1982Kohler V. -A- O-4-6096Viggo (Queen City No. 1)KD Energy LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,9115,480Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,31412.25570 S
2.8755,4867.8751,227 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 26, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13134744, documented in the API reference.