WELL · 42-131-35841 · DISTRICT 4
Herbst-Torel #7
Duval County · Loma Novia field · Vertical
Herbst-Torel #7 (API 42-131-35841) is a plugged well in Duval County, plugged July 2, 2009, last operated by Xto Energy Inc..
The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 3,003 ft.
It was permitted by Harkins & Company and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report one formation top, including Loma Novia.
Operator of record
Permitted by Harkins & Company; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Harkins & CompanyDec 3, 1984 |
- 3,003
- total depth, ft
- 2
- permits on file
- Dec 3, 1984
- last permit issued
- Nov 20, 2003
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 20, 2003
- Shut in
- —
- Plugged
- Jul 2, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Herbst-Torel O-4-10839 | Loma Novia | XTO Energy Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2009 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 259811-99 | Other | Harkins & Company | Nov 29, 1984 | Dec 3, 1984 | — | 3,003 |
| 152912-99 | Drill | Harkins & Company | Feb 24, 1982 | Feb 24, 1982 | Feb 28, 1982 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 20, 2003 | Herbst-Torel O-4-10839 | Loma Novia | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 586 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Loma Novia | 2,630 | -2,044 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,642 | 2,664 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 347 | 12.25 | 280 S |
| 4.5 | 3,003 | 7.875 | 570 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 2004 | Dec 8, 2003 | — |
| 00 | Sep 26, 1985 | Aug 7, 1985 | — |
| 00 | Sep 12, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-35841 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-35841 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 190K
- bbl, all reported
- Nov 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000058676 | W-14 Disposal | Plugged Jul 17, 2009 | 500 | 1,300 | 2,642–2,664 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 42,970(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13135841, documented in the API reference.