WELL · 42-131-36749 · DISTRICT 1
American Natl. Life Ins. #1
Duval County · Hostetter (FB-A) field · Vertical
American Natl. Life Ins. #1 (API 42-131-36749) is a plugged well in Duval County, plugged February 18, 1990, last operated by Bass Enterprises Production CO..
The RRC has issued 2 drilling permits between 1985 and 1989, permitted to 14,000 ft.
Completion filings report 6 formation tops, including Queen City, Wilcox, 1st Tom Line, 1st Tom Lyne.
Operator of record
Bass Enterprises Production Co.
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 25, 2006
- Permits on file
- 801
- Phone
- (817) 390-8400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Bass Enterprises Production Co.Mar 9, 1989 |
- 14,000
- total depth, ft
- 2
- permits on file
- Mar 9, 1989
- last permit issued
- Nov 20, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 20, 1985
- Shut in
- —
- Plugged
- Feb 18, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-1-122274 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 356797-99 | Recompletion | Bass Enterprises Production Co. | Mar 8, 1989 | Mar 9, 1989 | — | 13,000 |
| 279774-99 | Drill | Bass Enterprises Production Co. | Jul 8, 1985 | Jul 9, 1985 | Aug 3, 1985 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 20, 1985 | American Nat L. Life Ins. G-4-120083 | Lowe Deep (12550) | Bass Enterprises Production Co. | Plugged | — |
| Nov 20, 1985 | American Natl. Life Ins. G-1-122274 | Hostetter (FB-A) | Bass Enterprises Production Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 465 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 6,175 | -5,710 |
| Wilcox | 8,270 | -7,805 |
| 1ST Tom Line | 10,230 | -9,765 |
| 1ST Tom Lyne | 10,230 | -9,765 |
| Reagan | 12,550 | -12,085 |
| Reagan Sand | 12,550 | -12,085 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,561 | 12,587 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 108 | 26 | — |
| 13.375 | 3,010 | 17.5 | 2,110 S |
| 9.625 | 8,803 | 12.25 | 2,175 S |
| 5.5 | 12,998 | 6.75 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 5, 1986 | Oct 3, 1986 | — |
| 00 | Oct 15, 1986 | — | — |
| 00 | Mar 6, 1986 | Feb 11, 1986 | Yes |
| 00 | Mar 1, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-36749 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-36749 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13136749, documented in the API reference.