TEXAS · WELLS · DUVAL COUNTY · DCR 79 LEASE · API 42-131-37621 · DISTRICT 04

DCR 79 #3

Plugged

Duval County · Seventy-Six South field  · Vertical

Dcr 79 #3 (API 42-131-37621) is a plugged well in Duval County, plugged October 29, 2007, last operated by Killam Oil CO. Ltd..

The RRC has issued one drilling permit (amended once), issued October 5, 1992, permitted to 3,000 ft.

It was permitted by Tri-C Resources, Inc. and has since transferred to Killam Oil CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including Mirando.

Its lease has reported 6.06K barrels of oil and 1.92K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Killam Oil Co. Ltd.

Permitted by Tri-C Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Aug 1999
Latest permitTri-C Resources, Inc.Oct 5, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
2
permits on file
Oct 5, 1992
last permit issued
Feb 20, 2002
completed
6.06K
cumulative oil, bbl
1.92K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 20, 2002
Shut in
—
Plugged
Oct 29, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
DCR 79 O-4-12118Seventy-Six, SouthKillam Oil Co., Ltd.16.06K1.92KJan 1993 – Aug 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tri-C Resources, Inc.Jan 1993 → Dec 1993
  2. 2Sonat Exploration Co. - HoustonJan 1994 → Feb 1996
  3. 3Killam Oil Co., Ltd.Mar 1996 → Aug 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404266-98DrillTri-C Resources, Inc.Nov 19, 1992Oct 5, 1992Oct 18, 19923,000
404266-99DrillTri-C Resources, Inc.Oct 5, 1992Oct 5, 1992—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 20, 2002DCR 79 O-4-12118Seventy-Six SouthKillam Oil Co. Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 500 ft elevation.Download CSV →

FormationMD ftSubsea
Mirando1,521-1,021

Perforations

Perforated and open-hole intervals.

FromToType
1,5211,524Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538412.25195 S
4.52,5107.875410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 7, 2002Mar 18, 2002—
00Jan 21, 1993Nov 23, 1992Yes
00Dec 4, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
616K
bbl, all reported
Oct 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091918H-1 InjectionPlugged Nov 7, 20073,0007501,521–1,524

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13137621, documented in the API reference.